By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Loan for CS for the Construction of City Roads approved
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Loan for CS for the Construction of City Roads approved
OTHER NEWS

Loan for CS for the Construction of City Roads approved

Published December 17, 2015
Share
SHARE

sarajevo cityGovernment of FB&H was introduced with the information on the loan application of the Canton Sarajevo for the Project of construction of city roads and supported the initiative for providing additional resources by taking the loan of up to 6 million EUR from the European Bank for Reconstruction and Development (EBRD).

Information on credit of the EBRD for this project, as the basis for negotiations, was accepted as well.

Federal Ministry of Finance and the Ministry of Finance of the Canton Sarajevo will be responsible for appointing their authorized representatives for the team for negotiations on this loan. The final decision on the loan will be made after the completion of negotiations with the EBRD, and Canton Sarajevo will be the final borrower.

Federal Ministry of Finance will submit information on the negotiations to the Government of FB&H, as well as the text of the agreed contract between B&H and EBRD, and the conclusions will be submitted to the Ministry of Finance and Treasury of B&H for the implementation of further procedures related to the loan.

The South longitudinal is, at the moment, for the most part road with two lanes (one in each direction), with smaller parts where it is expanded to three lanes. Extension of the South longitudinal to 2×2 lanes will contribute to the improvement of the overall public transport in Sarajevo. On the part of the road where it is needed to relocate the building (Zagrebacka Street), integration into existing state will be temporarily performed, until conditions for the relocation of the residential building are created.

South and North longitudinal, together with the First and Twelfth transversal, within which was reconstructed and built Stupska loop as the largest transport hub, will completely relieve the main city longitudinal through which more than 60,000 vehicles are passing on a daily basis.

(Source: klix.ba)

Bosnian Anto Sakic is the first Man to win the Mont Blanc with the Help of Crutches

Sarajevo: Rally in support of Protests in Macedonia announced

How will the Fast Road Lasva-Travnik be financed?

Health Crisis in Una-Sana Canton

Yellow Meteoalarm issued: Warning for the Wind and Rainfall

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Vice President of FB&H visits SSST University
Next Article Arsenal and Liverpool targeting Sead Kolasinac?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Defense Minister: The Time has come to begin the Discussion on the Abolition of Entities in BiH
January 9, 2026
Iran says it would not tolerate ‘Saboteurs’
January 9, 2026
Efendic on Candidacy for a Member of the Presidency: We need Quality Change
January 9, 2026
Kallas: The Iranian People are Fighting for their Future
January 9, 2026
The Electricity Supply across BiH is stabilizing
January 9, 2026
Becirovic: January 9th is not a Date to celebrate, it is a Black Date
January 9, 2026
Sarajevo Tops The List Of The Cheapest City Break Destinations In Europe
January 9, 2026
A Year in Review: What Did We Do in 2025 While Femicide Remained a Reality in BiH?
January 9, 2026
Lifeless Body Of Man From Italy, Who Went Missing In Banja Luka, Found
January 9, 2026
Strengthening Readiness in the Skies Above BiH
January 9, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?