By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Loop in Zenica getting constructed at Full Speed!
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Loop in Zenica getting constructed at Full Speed!
OTHER NEWS

Loop in Zenica getting constructed at Full Speed!

Published: March 19, 2016
Share
SHARE

12476582_1742145772688766_1234672640_nConstruction works on the section of Corridor 5C, section Zenica South – Zenica North are in full swing. One of the most challenging sections of this megaproject is constructed and supervised by local companies. The main contractor is “Hering” from Siroki Brijeg “, while it is supervised by a consortium of companies “Divel” from Sarajevo and “TAEP” from Kuwait.

“We are working at full speed, and current weather conditions are suitable for the construction so we are using it as much as we can in order to respect the deadlines,” said one of the truck drivers.

The investor “Highways of FBiH” set the deadline for completion of these works by the year of 2017, which, according to the works that are currently being performed, could be quite realizable.

Construction of this section is financed from the funds provided by the Kuwait Fund for Arab Economic Development (KFAED).

“Value of the works is 33.5 million BAM, and value of supervision is 2.5 million BAM. If there are no unforeseen circumstances, the deadline for completion of these section should be respected, so that the section should be completed next year,” added from the “Highways of FBiH”.

Beginning of works on this section was announced on the 23rd of October 2014.

(Source: akta.ba)

BiH Institute has issued an Orange Alert for Strong Winds
OSCE Mission presents report on Enjoyment of Freedom of Peaceful Assembly in BiH
Reductions of Fees for entry into the register book from 200 BAM to 35 BAM?
Cruiser Bicycles from Travnik became a real Hit in the World
Metropolitan Hrizostom: It is important to promote Peace and Goodwill, without that there is no Coexistence
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Hidden Commons in Marijin Dvor nominated for European Award
Next Article Products of Tuzla Brewery on the Shelves in Kuwait and Saudi Arabia soon
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Delic: “We are not entering the New Mandate with Announcements of Labor Market Reforms, but rather implementing them”
August 30, 2026
EUFOR Multinational Troops put quick Response to the Test
August 30, 2026
Italian Ambassador Amused the Public with Her Post-Match Post: “Maybe We Could Try Chess?”
August 30, 2026
New Scanners can prevent Election Fraud, but not Voter Suppression
August 30, 2026
Red Star faces severe Punishment for Glorifying Ratko Mladic
August 30, 2026
Serbian Minister of Justice: Mladic will be buried with full stateS
August 30, 2026
Neum as Symbol of Underwater Film, Art and Marine Life Protection
August 30, 2026
The Mechanism makes Further update Following the Passing of Ratko Mladic
August 30, 2026
Dutch, French, Italian and Romanian EUFOR Forces Demonstrate Rapid Reinforcement
August 29, 2026
Sarajevo Run Fest Brings Together More Than 3000 Runners from Over 50 Countries
August 29, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?