By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: More than 140 Million Euros in EC Grants for the Mostar North/South Project
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > More than 140 Million Euros in EC Grants for the Mostar North/South Project
BUSINESS

More than 140 Million Euros in EC Grants for the Mostar North/South Project

Published: February 9, 2026
Share
SHARE

The Council of Ministers of Bosnia and Herzegovina approved today at its session the proposal for a grant agreement (Corridor Vc project Mostar north – Mostar south) between Bosnia and Herzegovina and the European Bank for Reconstruction and Development (EBRD) which refers to an investment grant from the European Common Fund for the Western Balkans program.

An investment grant in the amount of EUR 140,372,000 for the financing of the Mostar North – Mostar South project on Corridor Vc was approved by the European Commission (EC) through the European Common Fund for the Western Balkans, and the grant will be managed by the EBRD.

The purpose of the project is to help Bosnia and Herzegovina in the construction of an approximately 15 km long section of the highway on Corridor Vc with two dual lanes. The section starts with the Mostar north loop and ends with the Mostar south loop. The section is expected to have five tunnels and 10 viaducts on each of the two carriageways.

The grant co-finances the Corridor Vc – Mostar North – Mostar South project together with the previously concluded Loan Agreement between Bosnia and Herzegovina and the EBRD, worth 220 million euros.

The proposal of the contract with the basis for its conclusion will be submitted to the BiH Presidency for further decision-making procedures, and the Minister of Finance and Treasury has been proposed as the BiH signatory – the Council of Ministers of BiH announced.

Citizens’ Savings exceeded 10 Billion BAM for the first time after the war
International Airport Sarajevo-Promotion on the Occasion of Certification and Re-certification of ISO Standards
Protests Cause Traffic Disruptions Across Bosnia and Herzegovina
Controlled Electricity Prices for Households in BiH are questionable
SIPA Reveals Details of Major Operation in BiH: 18 Arrested in Smuggling Crackdown
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Election Irregularities in Doboj: One Voter voted every Minute at One Polling Station
Next Article Minister Forto: Without a strong Agency, BiH will lose Control over Civil Aviation
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Barbarez: Against Romania we have to play bravely and take Advantage of our Opportunities
September 27, 2026
A New Generation Ready to Serve
September 27, 2026
Women mapped unsafe Locations in Mostar and Gacko
September 27, 2026
Excellent Results of the Sarajevo Swimming Club
September 27, 2026
Covic: “If the Outvoting of Croats Is Repeated, the Institutions of BiH Could Be Blocked”
September 27, 2026
Direct Foreign Investments in BiH in Decline over political Instability and lack of Labor Force
September 27, 2026
Romania Head Coach Gheorghe Hagi Ahead of the Match in Bucharest: We Will Do Everything to Beat BiH
September 27, 2026
Record-Breaking “Race for the Cure” in Sarajevo
September 27, 2026
Commemoration of the 34th Anniversary of the Suffering of Bosniaks in the Susica Camp
September 26, 2026
Dragons hold a Training Session in Warsaw ahead the Trip to Bucharest
September 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?