So far, more than 5.300 citizens of B&H participated in the survey, based on which the design of the future bridge on the highway, Corridor Vc Počitelj-Zvirovići will be selected, said to Fena the company Autoceste FB&H Mostar.
Last week on their Facebook page, Autoceste FB&H published a survey, where citizens can choose one of the three offered designs of the bridge Počitelj.
The survey will last until 28 January and so far the bridge design with the 127 meter space between the columns and which has the separated columns in a Y shape received most of the votes. This design so far received 63 % of the votes, and with 23 % of the votes follows the design with monolithic columns and 147 m space between columns. 14 % of the votes went to the design with monolithic columns and 85 meter space between columns.
The length of the bridge in all three designs is 975 meters and a height of 85 meters. The only difference is the appearance and range between columns.
The link to the survey is available on the Facebook page of Autoceste FB&H, as well as on the web page of the company: www.jpautoceste.ba.
(Source: Fena)




