By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: One of the key energy Facilities worth 80 Million BAM to be built in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > One of the key energy Facilities worth 80 Million BAM to be built in BiH
BUSINESS

One of the key energy Facilities worth 80 Million BAM to be built in BiH

Published: April 18, 2022
Share
SHARE

The Federal Ministry of Environment and Tourism has recently submitted a request for a preliminary environmental impact assessment for the Kovanici hydro powerplant (HPP)Construction Project on the Bosna River.

This is one of the capital projects of Elektroprivreda Bosnia and Herzegovina (BiH) which is expected to increase the electricity production of the public concern from renewable, clean sources.

An investment worth 38.8 million euros

The HPP would be located 25 kilometers downstream from the town of Zenica. The installed capacity is 9.1 MW and the annual production is 46.2 Gwh.

The estimated value of the investment is 38.8 million euros, and the construction is planned from own funds and loans.

A Feasibility Study with geological exploration works, an Economic Feasibility Study and a request for a concession, as well as a Preliminary Design have already been prepared.

Elektroprivreda BiH has included this project in its plan to increase the share of electricity production from renewable resources in total production.

HPP Kovanici is one of 15 planned hydropower projects, which will ultimately harness the hydro potential of the Bosna River, from its source near Sarajevo to the entity line with Republika Srpska (RS).

Run-of-the-river hydropower plant

According to the Terms of Reference, HPP Kovanici contributes to meeting the growing demand for electricity in the country.

HPP Kovanici was designed as a classic type of run-of-the-riverplant. It is a concrete gravity overflow dam, the operator is part of the non-overflow part of the dam, and on the right and left side of the partition profile there are the wing parts of the dam – gravity blocks.

The designed dam of HPP Kovanici forms an accumulation at a length of approximately 2.60 km for Q1/100, while for the installed flow it is approximately 3.62 km long.

At the stretch of the reservoir there is the planned highway 5C, which crosses from the right to the left bank downstream from the railway bridges, Avaz writes.

E.Dz.

Public Revenues In The Federation of BiH records Increase
Fuel Prices Surge Across BiH as Citizens Rush to Fill Tanks
New Plant to open 700 new Workplaces
Defense Industry among five most successful Industries in BiH
From a Surplus to a heavy Deficit of 536 million BAM – where is the Money?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Symbol of wartime Mostar: The Basket between Life and Death
Next Article How will the Sanctions against Russia affect the Oil Refinery in BiH?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

The Ilidza Fire Department received a valuable Donation from Slovenia
June 20, 2026
EU Delegation after the FATF Decision: Eliminating Shortcomings is crucial for BiH’s European Path
June 20, 2026
Penava Shifts the Tone: We Don’t Want “Herzeg-Bosnia,” and We Aren’t Bringing BiH into Question
June 20, 2026
The Only Image of Death in the Yugoslav War: EFJ Seeks To Strip Bojan Stojanović of an Award
June 20, 2026
The Dragons Could Face Germany in Knockout Stage, But Only in Theory: Here Is Who Barbarez’s Side Could Actually Draw
June 20, 2026
The Tenth Jubilee Edition of the Vucko Trail, the largest Trail Race in BiH
June 20, 2026
Great Anniversaries of Svrzo’s House and a unique Setting for Damir Imamovic’s Sevdah
June 20, 2026
Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension
June 20, 2026
Edin Dzeko is an Idol for the young Players
June 20, 2026
Food Safety Agency of BiH: Condition Good, but Risk Must Be Reduced to a Minimum
June 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?