By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: RS to benefit from a more Reliable Power Supply and improved Energy Efficiency
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > RS to benefit from a more Reliable Power Supply and improved Energy Efficiency
BUSINESS

RS to benefit from a more Reliable Power Supply and improved Energy Efficiency

Published: November 3, 2018
Share
SHARE
People and businesses in the Republika Srpska, one of the two entities of Bosnia and Herzegovina, will benefit from a more reliable power supply and improved energy efficiency thanks to a loan provided by the EBRD with the support of TaiwanICDF.

The funding of €15 million will finance the reconstruction of the medium and low-voltage power network in Elektrobijelijina’s distribution area as well as the installation of smart meters. Losses in the distribution of power and high consumption due to outdated and inaccurate meters are major contributors to the high energy intensity in Bosnia and Herzegovina which causes additional costs to consumers.

Investing in a more modern, efficient and flexible power distribution network will promote improved efficiency through reduced power losses and greater awareness of energy consumption patterns. It will also facilitate the penetration of higher levels of distributed renewable energy.

The financing is provided as a loan to ZEDP Elektro-Bijeljina A.D.Bijeljina, the state-owned power distribution company in Republika Srpska. Up to €7.5 million of the loan will be provided by the Green Energy Special Fund, established and administered by the EBRD with the contribution of TaiwanICDF. Previously, the EBRD also provided a loan to ZP Elektrokrajina A.D. Banja Luka for a similar purpose.

Supporting energy saving and improved energy efficiency as well as promoting sustainable sources of energy is a key activity of the EBRD. Last year alone, the Bank committed 43 per cent of its €9.7 billion in new investments under its Green Economy Transition (GET) approach.

The Bank is a major investor in Bosnia and Herzegovina. Since the beginning of its operations in the country the EBRD has invested €2.1 billion in around 150 projects.

CEC reminds on Deadline for the Implementation of the indirect Elections
The most talented Children from all across the Former Yugoslavia on the open Sarajevo Mixer House
Migrants Crisis escalating in BiH, Health Inspections determined a Horrific Situation in Una Sana Canton
Import of Over Twenty Tons of Oranges banned
Hans Siegfried Liepe: I could never leave Una and go to Germany
TAGGED:#BiH#Bijeljina#EBRD#network#RS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article More than 3,000 High school Students visited Srebrenica
Next Article Which Town in Herzegovina is a Magnet for Tourists?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Minister Delic signed Contracts: Almost 840 Thousand BAM for People with Disabilities, Safe Houses
August 23, 2026
Golden Cauldron of Semberija: Cooking for Prestige and the best Snacks
August 23, 2026
4th Mostar Jazz Fest begins Tonight
August 23, 2026
Paragliders from 24 Countries arrived in Drvar
August 23, 2026
New Corridor 5c Subsection in Operation from Tomorrow
August 23, 2026
Free Electronic Signatures Again Available Through IDDEEA Amid Legal and Political Dispute
August 23, 2026
Wollner: I was Interested in the Way Grief And Guilt Contaminate Each Other
August 23, 2026
Hungarian Helicopters arrived at Camp Butmir to reinforce the Aviation Detachment
August 23, 2026
34 Years have passed since the Killing of Sarajevo Citizens in Halaci Street
August 23, 2026
French Military Vehicles arrive by Rail in Sarajevo for ‘Quick Response 2026’ Exercise
August 23, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?