By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: RS to benefit from a more Reliable Power Supply and improved Energy Efficiency
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > RS to benefit from a more Reliable Power Supply and improved Energy Efficiency
BUSINESS

RS to benefit from a more Reliable Power Supply and improved Energy Efficiency

Published November 3, 2018
Share
SHARE
People and businesses in the Republika Srpska, one of the two entities of Bosnia and Herzegovina, will benefit from a more reliable power supply and improved energy efficiency thanks to a loan provided by the EBRD with the support of TaiwanICDF.

The funding of €15 million will finance the reconstruction of the medium and low-voltage power network in Elektrobijelijina’s distribution area as well as the installation of smart meters. Losses in the distribution of power and high consumption due to outdated and inaccurate meters are major contributors to the high energy intensity in Bosnia and Herzegovina which causes additional costs to consumers.

Investing in a more modern, efficient and flexible power distribution network will promote improved efficiency through reduced power losses and greater awareness of energy consumption patterns. It will also facilitate the penetration of higher levels of distributed renewable energy.

The financing is provided as a loan to ZEDP Elektro-Bijeljina A.D.Bijeljina, the state-owned power distribution company in Republika Srpska. Up to €7.5 million of the loan will be provided by the Green Energy Special Fund, established and administered by the EBRD with the contribution of TaiwanICDF. Previously, the EBRD also provided a loan to ZP Elektrokrajina A.D. Banja Luka for a similar purpose.

Supporting energy saving and improved energy efficiency as well as promoting sustainable sources of energy is a key activity of the EBRD. Last year alone, the Bank committed 43 per cent of its €9.7 billion in new investments under its Green Economy Transition (GET) approach.

The Bank is a major investor in Bosnia and Herzegovina. Since the beginning of its operations in the country the EBRD has invested €2.1 billion in around 150 projects.

Minister Forto: We continue to work for better Working Conditions for our Transporters

Damage caused by the Storm to Crops, higher Prices for Consumers

Bosnian Lejla Selimovic redesigns old Furniture into Pieces with Story and Soul

Corruption and Political Domination Push BiH to Low Score on State Capture Index

Independence Day marked by Laying Flowers at Kovaci Cemetery

TAGGED:#BiH#Bijeljina#EBRD#network#RS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article More than 3,000 High school Students visited Srebrenica
Next Article Which Town in Herzegovina is a Magnet for Tourists?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Suspect Arrested in Connection with Woman’s Murder in Sarajevo
May 1, 2026
Thousands protest in Zenica, the Fight for the Steelworks is a Matter of the Industry’s Survival
May 1, 2026
One Person killed in BiH’s Capital
May 1, 2026
RS Government Report: Schmidt labeled as Usurper, call for Respect for Dayton
May 1, 2026
Street Named After Dr. Dušanka Vujasić Solemnly Opened in Goražde
May 1, 2026
IRMCT Confirms Defense of War Criminal Ratko Mladic Files Urgent Motion for Release
May 1, 2026
Zenica Meeting Sends Clear Message: Urgent Implementation of FBiH Government Plan for New Steel Plant
May 1, 2026
A two-million-BAM Scandal is Looming in Banja Luka over Monument Construction
May 1, 2026
Today is May Day, the Holiday of Labor and the Struggle for Workers’ Rights
May 1, 2026
Increased Traffic Intensity, the heaviest Congestion at Border Crossings to the South
May 1, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?