By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Talgo Trains to start operating from Monday?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Talgo Trains to start operating from Monday?
BUSINESS

Talgo Trains to start operating from Monday?

Published September 23, 2016
Share
SHARE

talgo-trainsRailways of FBiH will officially put into traffic Talgo sets of trains from Monday, the 26th of September 2016.

After successfully completed preparations and test runs, the train will, for now, run on the route schedule 714/715 between Sarajevo and Doboj.

“We named our new modern passenger train ‘BH train’ and we are waiting for verification. In fact, this is its most important function – to connect the whole BiH, quickly, safely and efficiently. On behalf of the Management Board of the Railways of FBiH, I want to thank everyone who have contributed the realization of this long-awaited project – workers of the Railways of FBiH, colleagues from the Railways of RS and the Regulatory Board of Railways of BiH,” said Enis Dzafic, managing director of the Railways of FBiH.

“BH train” will depart from Sarajevo at 4:28 pm and arrive in Doboj at 7:35 pm, while the departure of the train from Doboj will be at 03:49 am and arrival in Sarajevo at 06:53 am. Ticket prices will remain the same, plus the amount for the reservation. Stations at which the train will receive travelers are: Sarajevo, Visoko, Kakanj, Zenica, Zepce, Zavidovici, Maglaj and Doboj.

Capacity of “BH train” is 237 seats (200 seats of II class, 36 seats of I class, and one seat for the disabled persons). These are modern, high-speed trains that provide passengers with exceptional comfort, Internet access and other amenities in accordance with the most modern European trains.

It is planned to extend the current line to Banja Luka. This route will enable the passengers who are traveling from Tuzla to Sarajevo and vice versa, to have a good quality connection to Doboj with “BH train”, which would practically involve Tuzla in this project. Also, after the overhaul of the so-called “Southern line”, it is planned to introduce “BH train” on the route Sarajevo-Mostar-Capljina, and in the summer on the route Sarajevo-Ploce.

“Negotiations with Croatian Railways to introduce BH train on the international line Sarajevo-Zagreb are currently ongoing as well as the re-establishment of the rail traffic on the route Sarajevo – Ploce. Besides these projects, the plan is to establish rail traffic between Sarajevo and Bihac which requires electrification of another part of the railway, and the required amount for this investment is 2.3 million BAM. Railways of FBiH have been the backbone of freight transport and development of BH economy so far, and with the introduction of BH train, the Railways of FBiH want to become the leader in passenger traffic. We will unblock the railway passenger traffic with the final implementation of this project, and to create an environment for the establishment and revival of passenger traffic on the entire national, regional and European railway corridor. Our goal is to connect BiH and to be an integral part of European transport flows,” said Dzafic.

(Source: klix.ba)

While waiting for a new Tender for the Purchase of the Building, accusations of possible Crime are being made

Environmentalists against the Construction of HPP in BiH City

In 2018 the Total Number of Cattle decreased by 1,6%

Total Gross Revenues hit Record in BiH in 2018!

Sarajevo to receive New Trams after Forty Years

TAGGED:#railways#transportpassengersRailways of FBiHTalgo trains
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article U2 held a Concert at Kosevo 19 years ago
Next Article Karaula Tunnel to be open on Tuesday – Better and Safer Route between Sarajevo and Tuzla (Video)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BiH FM met with the Minister of Foreign and European Affairs of the Republic of Croatia
March 18, 2026
Europol coordinates largest Referral action targeting Terrorist Audio Propaganda
March 18, 2026
Oil Prices on the rise, a Barrel of Brent exceeded 108 Dollars
March 18, 2026
Komsic Meets Professor Pettigrew: Strengthening Memory Culture Key to Reconciliation in BiH
March 18, 2026
Bosniak Representatives sign Statement against Hate Speech and Islamophobia
March 18, 2026
Iran
Israeli Minister Claims Iran Intelligence Chief Killed in Strike
March 18, 2026
Jahorina Mountain enters the Spring Part of the Ski Season
March 18, 2026
Cimburiada, between Culture and Tourism
March 18, 2026
BiH FM: All BiH Citizens who expressed Interest evacuated from the Middle East
March 18, 2026
“Sounds Bridging Japan and BiH” Commemorative Concert Celebrating 30 Years of Diplomatic Relations
March 18, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?