By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Railway near Jablanica is “hanging” in the Air: Incalculable Damage to Railway Traffic in FBiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The Railway near Jablanica is “hanging” in the Air: Incalculable Damage to Railway Traffic in FBiH
OTHER NEWSOUR FINDINGS

The Railway near Jablanica is “hanging” in the Air: Incalculable Damage to Railway Traffic in FBiH

Published October 4, 2024
Share
SHARE

Railway traffic on the section Sarajevo – Mostar has been completely suspended, announced the Railways of the Federation of Bosnia and Herzegovina.

Dramatic scenes come from the part of the railway line near Jablanica, where part of the railway line was literally in the air, separated from the ground due to landslides and floods caused by heavy rainfall.

A little earlier, the Mountain Rescue Service (GSS) of Jablanica called on the residents to contact the GSS and the firemen for help, in order to jointly try to save those threatened by the floods. During the night, heavy rains caused the water level to rise, which resulted in numerous landslides and floods, blocking Jablanica completely.

On the main road Konjic-Jablanica-Mostar, as well as on the road Jablanica-Prozor and Jablanica-Blidinje, there were numerous landslides or rocks on the roadway, landslides and flash floods, which caused the traffic to stop. Alternative directions (Sarajevo-Mostar) at the time of this suspension are: Sarajevo-Novi Travnik-Rostovo-Bugojno-Kupres-Tomislavgrad-Posušje-Mostar or Sarajevo-Foča-Tjentište-Gacko-Mostar.

Traffic was also suspended on the roads: Busovača-Kiseljak, Kiseljak-Kreševo ​​and at the entrance to Kiseljak (from the direction of Sarajevo), where traffic was suspended due to water spilling onto the roadway, flash floods and landslides.

In areas where it is raining, drivers are urged to drive with maximum caution and to adapt their driving to the current road conditions.

Due to the work on the replacement of crossing devices on the Reljevo viaduct, on the section of the Sarajevo North-Butila highway, vehicles are traveling in one traffic lane in the direction of travel. On the section Podlugovi-Visoko, due to the works on the installation of the fenders at the site of the works, the overtaking lane is in operation, and the speed is limited to 60 km/h.

On the main roads Matuzići-Doboj and Vitez-Kaonik, due to current works, traffic is slow, with alternating passing of vehicles. Given that these are extremely frequent sections, longer lines of vehicles form in both directions at the work sites during the day.

Rehabilitation works are also current on the main roads: Livno-Kamensko (Podgradina), Doboj-Gračanica (Brijesnica Velika), Kladanj-Živinice, Prozor/Rama-Jablanica, Foča-Ustikolina, Tarčin-Konjic and Međeđa-Višegrad.

On the main road Rogatica-Ustiprača, due to damage to the bridge, vehicles up to 30 tons are traveling in one lane, while traffic is suspended for vehicles over 30 tons.

There are no longer detentions for passenger vehicles at the border crossings, BIHAMK announced.

Huge Car Accident almost happened on the Route Mostar-Sarajevo! (Video)

Cardiovascular Surgery in Tuzla: World Methods available to Patients in BiH

Experts: Request for Review of the Lawsuit will show the seriousness of BH Political Establishment

Destiny brought a Bosnian and a Syrian together: We pray that our Kids never experience War!

After the Fire, “Krivaja” Company must continue with the Work

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Dodik promises 50 Thousand BAM each to the affected local Communities
Next Article At least 16 dead in the Catastrophic Floods in Jablanica!
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BiH Presidency Member meets with the Bosnian Diaspora in Washington
December 21, 2025
Prince Harry and Meghan Markle share Family Photo and Christmas Message
December 21, 2025
MP Magazinovic calls out Dodik over Nuclear Waste on the Border with BiH
December 21, 2025
How many Inhabitants does Bosnia and Herzegovina have?
December 21, 2025
“BIA Involved In The Death Of Slavko Aleksic Because Of Vucic’s Role In The ‘Sarajevo Safari’”
December 21, 2025
Survey Unemployment Rate In BiH Significantly Lower Than The Registered Unemployment Rate
December 21, 2025
Another Financial Shock: New Year Brings Higher Costs for Households
December 21, 2025
Epstein Case: 16 Files missing from US Department of Justice Website
December 21, 2025
BiH Lags The Most Behind The EU In Science, Innovation, And Technology
December 21, 2025
Bradara requested a Review of the Constitutionality of the Law on Southern Interconnection of the FBiH
December 21, 2025
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?