By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Third Solar Power Plant planned to be developed in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Third Solar Power Plant planned to be developed in BiH
BUSINESS

Third Solar Power Plant planned to be developed in BiH

Published: October 26, 2021
Share
SHARE

The company Etmax based in Banjaluka has asked the Government of the Republika Srpska for a concession for the construction and use of the Nevesinje solar power plant with an installed capacity of 60 MW. It will be the third large solar power plant in the Herzegovina region in Bosnia and Herzegovina.

The investment in the solar power plant is estimated at EUR 53.3 million, and the expected annual production is 84 GWh. Etmax designs, develops and builds small-scale photovoltaic power plants.

For each megawatt-hour of electricity produced, Etmax will have to set aside EUR 2.8

The government defined the conditions for the award of the concession, which will be signed for a period of up to 50 years. Etmax will have to pay a one-off fee of EUR 267,000, and EUR 2.8 per MWh of production in its PV facility.

The Ministry of Energy and Mining, which will conduct the negotiation procedure, has 60 days to submit a report to the government, a proposal for a decision on granting a concession and a proposal for a concession agreement.

Etmax will secure money for the investment through a loan

The negotiation process begins when a potential concessionaire submits a bid and a feasibility study to the government. The company’s obligations will be specified in the agreement.

The money for the construction of the solar power plant will be provided through a loan, Etmax’s director and founder Siniša Maksimović told Capital.ba. He also announced the company would have several partners in the project.

The Republic of Srpska has so far issued two concessions for the construction of solar power plants in Herzegovina. In July last year, a deal was signed with EFT for the Bileća power plant, and in October, a concession was awarded to state-owned company Elektroprivreda Republike Srpske (ERS) for solar park Trebinje 1.

Source: Balkan Green Energy News

Varhelyi: It is recommended that BiH be granted Candidate Status without Delay
Exhumation Process near Clinical Centre Sarajevo completed
Sarajevo International Airport records Significant Drop in Number of Passengers
Winter Time begins by moving Back One Hour on Sunday
How the Prokosko Lake, the Pearl of Nature in BiH, was destroyed
TAGGED:#BiH#Bihac#powerPlant#RS#solar
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BiH records an Annual Increase in consumer Price Levels of 3.0 Percent
Next Article What is the Average Number of infected with COVID-19 in Canton Sarajevo?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Cvitanovic: We submitted Candidate Lists for all Levels of Government for the upcoming Elections
July 6, 2026
SIPA detains One Person over NCB Interpol Zagreb Warrant
July 6, 2026
EC: Entities in BiH have the Right to develop International Cooperation, but must abide by the Constitution
July 6, 2026
EUFOR helps in Setting up a Mountain Shelter on Prenj
July 6, 2026
BiH FM to meet with the UK Minister of State for Europe, North America and Overseas Territories
July 6, 2026
Blanusa: An important Step towards uniting the Opposition and creating a strong Front for Change
July 6, 2026
WARM Festival in Sarajevo from July 6th to 12th
July 6, 2026
Mostar Civil Protection HQ: The Fire at the Uborak Landfill is extinguished
July 6, 2026
Two Homelands, One Heart
July 6, 2026
Third International Summer School opens at the Srebrenica Memorial Center
July 6, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?