By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Third Solar Power Plant planned to be developed in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Third Solar Power Plant planned to be developed in BiH
BUSINESS

Third Solar Power Plant planned to be developed in BiH

Published October 26, 2021
Share
SHARE

The company Etmax based in Banjaluka has asked the Government of the Republika Srpska for a concession for the construction and use of the Nevesinje solar power plant with an installed capacity of 60 MW. It will be the third large solar power plant in the Herzegovina region in Bosnia and Herzegovina.

The investment in the solar power plant is estimated at EUR 53.3 million, and the expected annual production is 84 GWh. Etmax designs, develops and builds small-scale photovoltaic power plants.

For each megawatt-hour of electricity produced, Etmax will have to set aside EUR 2.8

The government defined the conditions for the award of the concession, which will be signed for a period of up to 50 years. Etmax will have to pay a one-off fee of EUR 267,000, and EUR 2.8 per MWh of production in its PV facility.

The Ministry of Energy and Mining, which will conduct the negotiation procedure, has 60 days to submit a report to the government, a proposal for a decision on granting a concession and a proposal for a concession agreement.

Etmax will secure money for the investment through a loan

The negotiation process begins when a potential concessionaire submits a bid and a feasibility study to the government. The company’s obligations will be specified in the agreement.

The money for the construction of the solar power plant will be provided through a loan, Etmax’s director and founder Siniša Maksimović told Capital.ba. He also announced the company would have several partners in the project.

The Republic of Srpska has so far issued two concessions for the construction of solar power plants in Herzegovina. In July last year, a deal was signed with EFT for the Bileća power plant, and in October, a concession was awarded to state-owned company Elektroprivreda Republike Srpske (ERS) for solar park Trebinje 1.

Source: Balkan Green Energy News

Total of 14,821 Isolation Orders issued for People who entered Bosnia and Herzegovina

Art Collection Imago Mundi by Lucian Benetton arrived in Sarajevo

Coffee Prices Skyrocket On International Exchanges

EUFOR Major General Reinhard Trischak welcomed the Swiss Chief of Joint Operation Command

Six Million KM Through Grant Agreements from Japanese Government to BiH

TAGGED:#BiH#Bihac#powerPlant#RS#solar
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BiH records an Annual Increase in consumer Price Levels of 3.0 Percent
Next Article What is the Average Number of infected with COVID-19 in Canton Sarajevo?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Workers of ‘Nova Ljubija’ Mine ended the Hunger Strike
March 28, 2026
Zeljkovic after Victory in Wales: “We Dreamed of This – The Players Showed Heart and Character!”
March 28, 2026
Top Debtor List in Bosnia and Herzegovina Announced: 49 Companies Owe over Million BAM
March 28, 2026
Minister Forto: BiH Joins UN-Backed Project to Strengthen Social Cohesion
March 28, 2026
Demirovic: Goal on Tuesday against Italy? Of course, I will return it to everyone
March 28, 2026
US Lawmakers from Both Parties asking Trump to reimpose Sanctions on Dodik
March 28, 2026
Major Operation targets One of Scotland’s most violent Crime Networks
March 28, 2026
Iran agrees to UN Request for Humanitarian safe Passage through Strait of Hormuz
March 28, 2026
After the Duel with Wales: The Dragons advanced in the FIFA Rankings
March 28, 2026
ODIHR Director reiterates Commitment to supporting Democracy and Human Rights in Ukraine
March 28, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?