On Monday, the 26th of December, starts tolling on newly built section of the highway “9 januar” Banja Luka – Doboj, in the direction of Doboj to Prnjavor.
Using the highway will least pay the owners of vehicles of the first category, which includes cars, motorcycles, tricycles and quadricycles, as well as light commercial vehicles, and the price of toll for them is 4 BAM.
Owners of vehicles of the second category, which include passenger cars with trailers or caravans, will pay 8 BAM, while drivers of vehicles of the third category, i.e. buses and trucks, on behalf of tolls will allocate 12 BAM.
For the vehicles of the fourth category or vehicles with four or more axles or trucks with trailers, buses with two-axle trailers etc., the toll will amount to 20 BAM.
Tolling on the mentioned section will be conducted in a bit different edition of an open system, which differs from toll collection system on the E 661 Gradiska – Banjaluka in the fact that it has two entrance/ exit ramps, as announced from the PC Autoputevi Republike Srpske (Highways of the RS).
The principle of payment is that drivers enter the highway at one of the two existing toll stations, in Prnjavor and / or Kladari near Doboj, without stopping, and the payment is done when exiting on any of these toll stations.
The toll can be paid in BAM, effective foreign currency, cash payments, bank cards, as well as electronically, by using TAG devices.
(Source: ekapija.com)