By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension
BUSINESS

Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension

Published: June 20, 2026
Share
SHARE

The Government of the Federation of Bosnia and Herzegovina adopted a decision to extend the temporary suspension of toll collection on the Poprikuše–Nemila and Nemila–Vranduk subsections of Corridor Vc. The FBiH Government introduced this measure with the aim of easing traffic on the M-17 main road during intensive construction works. The decision on the suspension of toll payments will remain in effect until the end of next year.

Continuation of Free Traffic in the North

The public company Motorways of the Federation of Bosnia and Herzegovina will implement this measure on the ground in accordance with the guidelines of the line ministry. According to the new regulation, toll collection on the mentioned routes will remain suspended until December 31, 2026. These subsections were opened to traffic at the end of 2025 in order to reduce congestion in the Zenica region. The Poprikuše–Nemila subsection, with a total length of 5.5 kilometers, was released to traffic at full capacity, while construction workers only partially opened the Nemila–Vranduk subsection.

The Poprikuše–Nemila section also features the Bosna Tunnel, which, at 3.6 kilometers in length, currently represents the longest constructed underground facility on the entire Corridor Vc. Both subsections are located on the key Zenica–Doboj route. In this part of the alignment, construction companies are still carrying out works to connect the remaining segments of the motorway.

Financial Blockade by European Banks

Construction workers have abandoned part of the construction sites on this route due to unexpected administrative obstacles. On the Medakovo–Ozimice section, operational activities have been temporarily halted. The European Investment Bank suspended financing for the project, forcing competent services to revise the existing contracts with the contractors.

The Management Board of the company Motorways of FBiH is trying to find alternative funding sources to prevent a long-term standstill on Corridor Vc. The Ministry of Transport and Communications has requested an urgent report on the causes of the international creditors’ decision. Financial obstructions could slow down the planned completion of works on the northern branch of the motorway, Klix.ba reports.

Financial Support to Romas for Business
Czech Ambassador in B&H on Visit to Central Bosnia Canton
Results of SDG Accelerator for SMEs in Bosnia presented
Launch of Project “Credo Krajina”, 250 New Jobs
More than One Million Marks Invested
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Edin Dzeko is an Idol for the young Players
Next Article Great Anniversaries of Svrzo’s House and a unique Setting for Damir Imamovic’s Sevdah
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Becirovic – Steinmeier: Germany supports BiH’s European Path
June 24, 2026
Government of FBiH allocates 300,000 BAM for the Elimination of Damage caused by the Fire at the Uborak Landfill
June 24, 2026
The Dragons will have huge Support in Seattle Tonight, Fans confident of Victory
June 24, 2026
Minister Delic calls on Employers to protect Workers during extremely high Temperatures
June 24, 2026
Irfan Mirza, One of the Microsoft Heads: Protect Bosnia and Herzegovina If You Don’t, No One Will
June 24, 2026
One Person in BiH sentenced to Prison over National and Racial Hatred
June 24, 2026
Authorities Investigate Possible Arson After Tire Fire at Uborak Landfill
June 24, 2026
Applications are Open for Participation in the I LOVE FILM Programme of the 32nd SFF
June 24, 2026
BiH Leads Region in Preparing for EU Deforestation Rules
June 24, 2026
How much will BiH National Team earn if it Qualifies for the Knockout Stage
June 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?