By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
BUSINESS

30 Million BAM Project: Hydro power Plant Kakanj to be built soon

Published: August 23, 2017
Share
SHARE

Elektroprivreda BiH has issued a public call for the development of investment-technical documentation for the Hydropower Plant Kakanj.

The deadline for receiving bids is September 21st this year and the estimated total value of contract without VAT is 350 000 BAM.

Hydropower plant Kakanj has an installed capacity of 4.69 MW with a planned annual production of 22.58 GWh. Power plant Kakanj will be located at the location of the River Bosna, in the area of Kakanj municipality.

The total value of the investment is 30,5 million BAM and, as planned, it will be financed by credit and funds of JP EPBiH.

(Source: akta)

Dita celebrates the 39th Birthday: We proved that we can succeed!
A Couple from Australia traveled to BiH to swear Eternal Love (video)
Federal Primie Minister is in Stable Health Condition after being tested Positive for Coronavirus
Three Measures of “Concept of economic Development from 2014 to 2018” established
Mostar at 40 degrees Celsius the hottest City in the Region
TAGGED:#BiH#Kakanj#powerPlant#productionBUSINESS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article David Siljeg broke Record in Length of Flight with Paraglider (video)
Next Article Minister Mektic: No Information that Women are being paid to cover themselves
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Federal Minister of Labor and Social Policy signs Agreements worth Two Million BAM
July 19, 2026
The Dispute over Trgovska Gora enters a New Phase
July 19, 2026
‘Circle 99’ calls for Protection of BiH Sovereignty after Adoption of Croatian Parliament Resolution
July 19, 2026
Dodik: “It Is Completely Normal that Croatia Stands with Its Christian Catholic Croatian People”
July 19, 2026
The Victims of Genocide and the Mothers of Srebrenica Seek a Reaction from the OHR
July 19, 2026
Which Companies Export the Most, and Which Import the Most to Bosnia and Herzegovina?
July 19, 2026
Livno Cheese: Bosnia and Herzegovina’s Award-Winning Specialty Gains Global Recognition
July 19, 2026
A Year has passed since the Death of Josip Pejakovic: A great Man who dedicated his Life to BiH
July 19, 2026
The Majority is divided, Laws are Pending – is there a Compromise?
July 19, 2026
OLAF investigates FBiH Motorways: Will the Investigation slow down the Construction of Corridor Vc?
July 19, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?