By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
BUSINESS

30 Million BAM Project: Hydro power Plant Kakanj to be built soon

Published: August 23, 2017
Share
SHARE

Elektroprivreda BiH has issued a public call for the development of investment-technical documentation for the Hydropower Plant Kakanj.

The deadline for receiving bids is September 21st this year and the estimated total value of contract without VAT is 350 000 BAM.

Hydropower plant Kakanj has an installed capacity of 4.69 MW with a planned annual production of 22.58 GWh. Power plant Kakanj will be located at the location of the River Bosna, in the area of Kakanj municipality.

The total value of the investment is 30,5 million BAM and, as planned, it will be financed by credit and funds of JP EPBiH.

(Source: akta)

IMF will not pay the Second Tranche until All Obligations are fulfilled?
A Sale of BiH Public Broadcaster’s Real Estate scheduled for Today
Earthquake hit Area between Tomislavgrad and Siroki Brijeg
Sarajevo-based start-up FlyBosnia landed at Sarajevo Airport for the First Time
In three Years, Politicians spent more than 35 million BAM on Luxury Vehicles
TAGGED:#BiH#Kakanj#powerPlant#productionBUSINESS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article David Siljeg broke Record in Length of Flight with Paraglider (video)
Next Article Minister Mektic: No Information that Women are being paid to cover themselves
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Families Still Searching for 42 Missing Persons from Kalinovik, Demand Indictments
June 22, 2026
Kreka to Sell Property to Settle Debts and Secure Miners’ Future
June 22, 2026
Dodik talks about Prosperity, the Opposition about Financial Collapse
June 22, 2026
“A Decade of EU Support for Employment in BiH” Conference Today in Sarajevo
June 22, 2026
Member of BiH Presidency attends the International Policy Summit in Jerusalem
June 22, 2026
FIPA and Algeria’s AAPI Strengthen Investment Cooperation and Economic Ties
June 22, 2026
Tragedy near Gracanica: Woman found dead, Man died on the way to Hospital
June 22, 2026
EUFOR Commander Major General Maurizio Fronda visited Prnjavor
June 22, 2026
EU provides Vehicles to strengthen Migration Management and Internal Security in the Federation of BiH
June 22, 2026
GSS Prenj in Action to rescue a seriously injured Czech Citizen
June 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?