By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Company ”Praha” to Build a Solar Power Plant in Žepče
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Company ”Praha” to Build a Solar Power Plant in Žepče
BUSINESS

Company ”Praha” to Build a Solar Power Plant in Žepče

Published: May 26, 2015
Share
SHARE

Solar Power Plant Žepče ekapija.baLast week, the director of the company ”Praha” Rajko Đuričić, (who resides and works in the Czech Republic), spoke with the Mayor of Žepče, Mato Zovko. He informed the Mayor about intended investment plans on his, Đuričić’s, own property in Brankovići. The project is about building a solar power plant “Praha” with a strength of 150 kWp and peak power of 125.5 kW, as stated on the website of the Municipality of Žepče.

The complete investment is worth 450.000 BAM.

Đuričić obtained all the necessary documents for the construction, and announced the work will commence by the end of the year.

At the meeting, the excellent cooperation of the municipal administration, RAŽ and the potential investors was also mentioned.

 

(Source: ekapija.ba)

70 Million BAM for the Purchase of the Building of the BiH Indirect Taxation Administration
Over 462 Thousand Pensioners to receive the Payment in the Federation of BiH
Holland Investment Program Open For BiH Companies
‘First Balkan Shield – Industrial Expo & Summit 2026’ To take Place in Sarajevo
What should be done for the Election Process in BiH be improved?
TAGGED:#investment#new#plant#power#solarBUSINESS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Will Trnovo get its “Buroj Ozone“?
Next Article The contribution to the World Peace: B&H has sent 1,000 Soldiers in the World
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

23rd Anniversary of the Opening of the Potocari Memorial Center: An Enduring Reminder of the Genocide
September 20, 2026
The CS MoI thanked the Citizens after the Parade of Police Forces
September 20, 2026
Two Persons arrested over Money Forging in BiH
September 20, 2026
Two Bronze Medals for BiH Karate Athletes at Youth League Tournament in Mexico
September 20, 2026
The Price of Tickets for the Match with Romania is in advance from Tomorrow
September 20, 2026
Bosnia and Herzegovina still has 756 Square Kilometers under Mines
September 20, 2026
Puerto Flamenco Kicks Off Its Tour in Bosnia and Herzegovina with Ovations
September 20, 2026
Arnautovic: Our Citizens Voting Outside BiH Must Be Automatically Registered by the State
September 20, 2026
Srebrenica Memorial Center Presents Good Practices from Bosnia and Herzegovina to Activists from Ukraine
September 20, 2026
CBBiH: Orders worth almost 67.7 Million BAM were settled through Instant Payments
September 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?