By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Construction of Road that will connect Neum with Central BiH officially started
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Construction of Road that will connect Neum with Central BiH officially started
BUSINESS

Construction of Road that will connect Neum with Central BiH officially started

Published March 5, 2018
Share
SHARE

The road that will connect Neum, the only Bosnia and Herzegovina’s (BiH) city that exits the Adriatic Sea, with the rest of central BiH, has officially begun to be built.

Currently, to the only BiH city on the seaside, residents and tourists can only reach through Croatia, which means crossing the two borders.

Given that the construction of this road has begun more than 30 years ago, many residents think that this news is a pre-election story, and that the works will be short-lived.

However, according to Al Jazeera Balkans, the financial structure is closed, so there should not be any obstacles in the future construction.

The road section is divided into two lots for which the following contracts were signed yesterday for:

LOT 1: Asphalting of the road section Stari Neum – Babin Do (L = 5.3 km), construction of the road Babin Do – Ostrovac (L = 1.7 km) and construction of the tunnel Ostrovac (L = 190 m). The contractor is “Integral Inzinjering a.d. Laktasi”. The value of the works is 6.027.207,03 BAM.

LOT 2: Construction of the road at the road section Ostrovac – Brocanac (L = 5 km). Construction works of the road route is performed at this section. The contractor is “JV HP Investing d.o.o. Mostar” and “Putovi d.o.o. Grude”.   The value of the works is 5.924.253,83 BAM.

(Source: akta, ST)

Six Municipalities and Cities in BiH received a Certificate of favorable Business Environment

Trebinje Airport is planning a Terminal twice as big as Sarajevo

20th Edition of the International Food Fair to open in Mostar

Autumn slowly arriving: Early September brings lower Temperatures to BiH

Mostar left without Electricity due to heavy Thunderstorm

TAGGED:#BiH#neum#road#stolac
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sparkland: Winners of Student Architectural Competition “Nsoft Headquarters Building” announced
Next Article An unusual Recording from the Air: the wilderness of Ramsko Lake in the Winter (video)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The House of Peoples adopts Five Laws of the FBiH Ministry of Finance
April 22, 2026
Indictment filed against Anis Kalajdzic for Femicide
April 22, 2026
Minister Forto: Talks Requested with the Croatian Government on Drivers’ Stay and Inspections
April 22, 2026
Meeting Held Between Director Of Sarajevo International Airport And Chinese Ambassador To BiH
April 22, 2026
The Bosnian Film Festival starts Tonight in New York
April 22, 2026
FBiH Government launches Process of Restructuring of New Steelwork Zenica
April 22, 2026
SIPA searches Six Locations in Two Cantons over Organized Crime
April 22, 2026
A Spectacle Expected at Kosevo Stadium: 30,000 Fans Set to Attend BiH vs North Macedonia Match
April 22, 2026
Covic: Filipovic Can Respond to Any Questions Affecting the Croatian People
April 22, 2026
Sarajevo’s Most Beloved Cat Fatmir Found: “For Him, Sarajevo Ends at City Hall”
April 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?