By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
BUSINESS

”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production

Published February 25, 2013
Share
SHARE

They hydroelectric system “Elektroprivreda RS” is currently generating production volume by around 27 percent more than was planned for this year’s period.

The Directorate for Production of “Elektroprivreda RS” confirmed that daily production of electricity from hydropower plants these days is more than nine gigawatt-hours, and river flows are abundant. It was said that long-term stability of electrical production couldn’t account for the entire system, but that currently they can guarantee when it comes to the hydroelectric system on Trebišnjica.

“The hydropower on Trebišnjica is an accumulated hydrosystem and there has long been a plan for production on the basis of the current hydropower capability. Given that currently there is a large reservoir of water in Bileća, where elevation is 10 meters above the plan, which is around 200 gigawatt-hours above the plan, it is possible to announce the stable operation of power systems in the future’’, announced the Directorate for Production of “Elektroprivreda RS”.

They said that the flow of hydropower plants in Višegrad and Bočac, on the basis of current flow they cannot provide long-term production because they have reservoirs that provide production for one day (hydroelectric plant Višegrad) to seven days (hydroelectric plant Bočac).

Thermal power plants with a total production of “Elektroprivreda RS) accounts for 60 percent of total production.

In the last few years thermal power plants had a record production level.

Bimal Plans Revenue Growth in 2014

Penny Plus Ltd. Sarajevo celebrated the 20th Birthday

Complete Reconstruction of the most important Railway Line soon?

Monthly Exports of Furniture from BiH exceed 100 million BAM

SPARK calls on Entrepreneurs to present their Ideas

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Exhibition of video works in ”Collegium Artisticum”
Next Article Pjanić – the best player of the match Atalanta and Roma
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Josip Broz Tito died on this Day 46 Years ago
May 5, 2026
Femicide: Where is the Line between Information, Responsibility and Victimization?
May 5, 2026
UN Debates BiH as Republika Srpska Government Levels Serious Radicalism Accusations in Report
May 5, 2026
COM EUFOR meets Prime Minister of the Federation of BiH
May 5, 2026
School in Citluk banned Cell Phones and introduced strict Rules
May 5, 2026
IDU Forum 2026: BiH must take Advantage of the shifting Developments in Europe
May 5, 2026
Remembrance Day for 1,601 killed Children of besieged Sarajevo marked
May 5, 2026
Cantonal Court sentenced Four Persons to 41 Years in Prison over Distribution of Narcotics
May 5, 2026
Over 355 Million BAM allocated for Pensioners in the Federation of BiH
May 5, 2026
Civil Servants, Police Officers, Military Personnel in BiH can receive Gifts up to 300 BAM
May 5, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?