By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The first Wind Power Plant in BiH officially put into Operation
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The first Wind Power Plant in BiH officially put into Operation
BUSINESS

The first Wind Power Plant in BiH officially put into Operation

Published: March 15, 2018
Share
SHARE

The Wind Power Plant Mesihovina, which is the very first facility of that kind in our country, was officially put into operation.

The ceremony was attended by numerous officials including Chairman of the Presidency of BiH Dragan Covic, Prime Minister of the FBiH Fadil Novalic and many others.

“Elektroprivreda HZHB is the first one in BiH that moved from words to actions and constructed an object on the basis of use of renewable energy sources. I am very happy that this facility was built on the territory of Canton 10, which has a large natural potential for the production of energy from renewable sources,” said Borjana Kristo, the Chairman of the Parliamentary Assembly of BiH.

She also added that this investment gives a large impetus to the economic and all the other developments of this area, especially Tomislavgrad.

Marinko Gilja, Director General of Elektroprivreda HZHB, said that this is an investment of about 82 million EUR, of which the largest part, 72 million EUR, refers to the loan by the German State Development Bank (KfW).

“Elektroprivreda HZHB has been working hard and constructing since its establishment, with the aim to increase its production. In recent few decades, these are HPP Pec-Mlini and HPP Mostar mud, and all of that was done in order to improve the quality of their services. WPP Mesihovina is the first facility of this kind, and its construction was supported by all the levels of government,” stated director Gilja.

“This wind power plant is located in the central part of the Municipality of Tomislavgrad, it has 22 wind aggregates and a total installed power of 50.6 MW. Its annual production will amount to 165.17 GWh. With an average household consumption of 6,000 kilowatts per year, WPP Mesihovina will be able to supply about 27,500 households with electricity,” added director Gilja.

Mayor of Tomislavgrad Ivan Vukadin stated that according to the concession contract, a total of 2.05 % of produced and sold electricity will belong to the local self-government.

Take a look at the video.

(Source: R. D./Klix.ba)

 

 

Dzaferovic-Van der Bellen: Bilateral Relations between the Two Countries at an extremely high Level
How BH Passports are produced and why is it impossible to falsify them?
When will the Central Election Commission of BiH confirm the Results?
Production to start again in a Failed Factory in Livno
Government of FB&H: No Increase in the Prices of Electricity?
TAGGED:#BiH#renewableenergy#successElektroprivreda HZHBwind powerWPP Mesihovina
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The National Team of BiH to play at the new National Football Stadium soon?
Next Article Did you know what Hawking used to say about the Aggression against BiH?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Meeting of the Strategic Committee for Weapons, Ammunition, and Mine-Explosive Ordnance Held
November 18, 2026
Becirovic meets the Ambassador of the Republic of Italy Sarah Eti Castellani
November 18, 2026
Minic to announce the Name of the prime-designate for the Formation of the new RS Government
November 18, 2026
The FBiH Government approves over 3.5 million BAM for Miners
November 18, 2026
Dragons achieve slightly better Position at the FIFA Ranking
November 18, 2026
Trial of Federal Minister of Interior Ramo Isak for Endangering Security begins
November 18, 2026
War Criminal Dragomir Milosevic Stays in Prison: Request for Release Denied
November 18, 2026
The Battle for three Key Positions: Who will lead the Council of Ministers, Finance, and Diplomacy?
November 18, 2026
Who is the Bosnian at the Head of the Chamber with 800,000 Companies
November 18, 2026
Barbarez: The Substitutions raised the Level of Fight, and that brought a Turnaround
November 18, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?