By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: How many Kilometers of Highway does BiH have?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > How many Kilometers of Highway does BiH have?
BUSINESS

How many Kilometers of Highway does BiH have?

Published: March 17, 2024
Share
SHARE

Bosnia and Herzegovina has collected about three billion marks for 14 years from the special toll for the construction of highways and the reconstruction of other roads, which is charged per liter of fuel, but so far it has only managed to complete a little more than 220 kilometers of unconnected highways, mostly from loans .The most significant project, Corridor 5C, has been under construction for 23 years. Recently, another loan agreement was signed for the construction of a new section of the corridor.

SRĐAN AMIDŽIĆ, Minister of Finance of Bosnia and Herzegovina: “Fifteen kilometers of highway and two interchanges Mostar south, Mostar north, total value 110 million euros, credit is 15 years, grace period is four years”.

SUSAN GRANSSON, EBRD director for infrastructure in Bosnia and Herzegovina: “Concretely, the project is worth 220 million as of today, the first half is available. EBRD started financing this corridor in 2008, since then the bank has financed over 1 billion”.

On the other hand, in the Republic of Srpska, the opening of new kilometers of highway is expected at the end of 2025. So far, 112 kilometers of highway have been built in this entity. Five projects are currently active, according to Autoputevi Republika Srpska.

NEDELJKO ĆORIĆ, director of JP Autoputevi Republika Srpska: “Works have not opened on all of them and not all construction sites, the construction sites are on the section of the highway from Bijeljina to Rača, corridor 5c on the Doboj bypass and preparatory works on the section of the highway from Vukosavlja to Brcko, we are working on preparing the opening of the construction site and signing the contract from Bijeljina to Brčko and the Banjaluka Prijedor concession contract, where works on the first seven kilometers will be carried out.”

The section of the Sarajevo-Belgrade highway from Bijeljina to Rača, which is mostly financed by Serbia, was one of the most active construction sites this year.

DUŠAN BOBIĆ, Batković village near Bijeljina: “The works have started and are in full swing, they are progressing, as far as I am aware, the route has been penetrated to the edge and another layer is being made. The locals, as you said, did not believe that all this would be realized, but the works are progressing”.

PREDRAG SPASOJEVIĆ, Velika Obarska village near Bijeljina: “Here, the second layer is being worked from Šumarić to Batković, the second team is going towards Velino village and Broc, it is going well. The expropriation has also been completed, the houses have been demolished, everything that was planned is being done smoothly, so it continues and is being done”.

MILAN LAZAREVIĆ, Head of the Office of the Mayor of Bijeljina: “As part of a wider highway network, it will enable a better connection of the highway network within Republika Srpska and BiH itself, this section will relieve Bijeljina of transit traffic.”

In addition to the small number of built kilometers compared to the region, another problem of Bosnia and Herzegovina is that all built sections are not connected, so the real purpose of the highway – connecting cities and parts of the country – is only partially fulfilled, BHRT writes.

Foreign Investors want to build a Heating System from Kakanj to Sarajevo?
BiH Defense Industry: Firms Prepared for Export to Turkey
Transavia Flies to B&H From 2015?
Scientists warn that BiH only produces a Quarter of the Food Citizens need
Awards of the EU for Investigative Journalism in B&H to be awarded on Friday
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article More and more Doctors are leaving BiH, Salary is not the Reason
Next Article Humanitarian Aid Trucks have arrived in northern Gaza for the first time in Months
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

More than 30 Council of Europe Parliamentarians arrive in Sarajevo
May 17, 2026
The Museum of Literature and Theater Arts of BiH implements a Digital Library Project
May 17, 2026
New Law Makes Stay of Workers from BiH in Croatia Easier
May 17, 2026
34 Years Ago, Defenders of Sarajevo Thwarted Aggressors’ Hellish Plan
May 17, 2026
Academic Freedoms at Universities in BiH increasingly threatened by Political Pressures
May 17, 2026
BiH and Moldova Move Toward First-Ever Scheduled Air Links
May 17, 2026
SOC: LGBTI Persons in BiH still without full Protection
May 17, 2026
Three Gold and One Silver Medal for Young BiH Athletes
May 17, 2026
Schmidt Signals Possible Breakthrough on State Property Issue in BiH
May 17, 2026
Bulgaria is the Winner of the 70th Edition of Eurovision Song Contest
May 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?