By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Hydro Power Plant “Bogatici-Nova” put into operation
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Hydro Power Plant “Bogatici-Nova” put into operation
BUSINESS

Hydro Power Plant “Bogatici-Nova” put into operation

Published: September 5, 2018
Share
SHARE

President of the RS, Milorad Dodik, and the director of “Elektrodistribucija” Pale, Ljubomir Mrda, put into operation HPP “Bogatici-Nova” in the Municipality of Trnovo. This plant has installed power of 9.96 MW and an average annual production of 46.26 million kWh of electricity.

Mrda also noted that the hydroelectric power plant “Bogatici-Nova” is the largest and most modern hydropower plant that was recently constructed in the territory of the RS, and a lot of knowledge, experience and money were invested in its construction.

“The total value of this investment amounts to 18.5 million BAM and it is an example of good use of our resources and renewable energy sources. The installed power of this hydro power plant is 9.96 MW, the projected annual production is 41 GWh of electricity, and the expected annual income will be around 5 million BAM. This income will enable further development of this company, new investments and new workplaces,” noted Mrda.

He noted that the realization of this project represents a success of both administration and all employees in the company “Elektrodistibucija” Pale.

The hydroelectric power plant was constructed on Zeljeznica River, and the investor is the company “Elektrodistribucija” Pale, which operates within the “Elektroprivreda of the RS”.

Mrda stated that it is one stable, respectable and socially responsible company that invests special efforts to satisfy more than 60,000 users of electricity in a total of 13 municipalities in the eastern part of the RS.

(Source: akta.ba)

Parents of Children with Disabilities have been deprived of their Right to Vehicle Registration
Covic and Vucic discussed the Improvement of Relations between BiH and Serbia in Belgrade
New Residential Complex worth 20 million BAM to be built in Zenica
Delegation of the Republic of Serbia met with Officials from Republika Srpska
Company Voćar From Zvornik Is Example of Sustainable Return
TAGGED:#BiH#electricity#productionHPP Bogatici-Novathe RS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Jusuf Nurkic is the most highest paid Bosnian Athlete in History
Next Article How the Money from Clearing Debt was spent?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

RS Constitutional Court: Bosniak Club’s Request for a Declaration on the Closure of the OHR is unacceptable
June 17, 2026
“I want the Euphoria around Dragons to last, it will be easier for us to play Switzerland”
June 17, 2026
Interview with Zvizdic: BiH cannot Progress on the European Path while SNSD is an important Political Factor
June 17, 2026
The National Assembly of Republika Srpska concluded its Special Session
June 17, 2026
The Football Team of BiH is leaving the Base in Salt Lake City
June 17, 2026
Dynamic Response 26-6: COM EUFOR Watches AF BiH Demonstrate Its Readiness
June 17, 2026
Rutte: The US is not withdrawing from Europe by announcing a Reduction in NATO Funding
June 17, 2026
Is the European Path or the European Halt?
June 17, 2026
Central Bank of BiH Unveils Commemorative Medallion Honoring the Nation’s World Cup Legacy
June 17, 2026
Three Persons arrested over Unauthorised Drug Production
June 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?