By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: How much will cost the Construction of the Fast Road Sarajevo-Belgrade?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > How much will cost the Construction of the Fast Road Sarajevo-Belgrade?
OTHER NEWS

How much will cost the Construction of the Fast Road Sarajevo-Belgrade?

Published: April 15, 2017
Share
SHARE

motorwayTwo Sarajevo institutes, IPSA and Eptisa BiH, submitted and presented technical study for the construction of the fast road Sarajevo – Vardiste to the Delegation of the European Union in BiH, in which they determined the five variants of the construction of the fast road Sarajevo – Belgrade, the total length and costs of all sections with routes and instructions in details.

The first and the most unfavorable route that was proposed in the study, Pale – Sokolac – Rogatica, with the length of 113.2 kilometers would cost 1.2 billion EUR.

The most favorable route is over Praca, which would cost a total of 994.6 million EUR. The length of the route is 113.4 kilometers and it would go from Praca through the canyon of Hrenovica and then through the bank of the river Drina and across Ustipraca to Vardiste in Visegrad. On this route would be built tunnels and bridges, according to the submitted study.

Experts from IPSA and Eptisa BiH on the fast road Sarajevo – Belgrade predicted the construction of loops in Lukavica, Pale, Sokolac, in Praca, Hrenovica, Mesici, Ustipraca and Visegrad.

The fast road would especially solve the problem of detours around Rogatica, Visegrad, and Sarajevo who have transit traffic passing through the city center or near it.

Places Pale, Gorazde and Sokolac would get the road of high rank in their vicinity to which they could be quickly connected over existing or newly constructed road network.

The study did not define whether within the fast road will be open or closed systems of payment.

The Government of Turkey showed interest in financing this route, and after the presented studies, the authorities need to agree on the most convenient and most efficient route.

(Source: Dz. C./Klix.ba)

Chairman of Bosnia’s Presidency sends Telegram of Condolences to President of Lebanon
What is the Number of Credit Cards used by Citizens of BiH?
Razija Mujanovic, BH Basketball Player, entered the Hall of Fame
Free Internet in Baščaršija
Sead Kolasinac comments after Mesut Ozil gets Criticism
TAGGED:#BiH#construction#fastroad#infrastructure#investment#road#serbiaSarajevo-Belgrade
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article 1.1 million BAM spent on Projects in the Field of Public Administration in 2016
Next Article Bosnian Student Marina Velickovic won a Scholarship of Bill Gates
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Historic First: Serbia Respects Hague Verdict Against Ratko Mladic Through Recommendation to Belgrade Mayor
July 24, 2026
EUFOR Marks the Change of Command of the German Contingent
July 24, 2026
Russian Gazprom increased the purchase Price of Gas to Energoinvest
July 24, 2026
Fatima Kurtic Fired in Luxembourg for Posting about Gaza: “They Wanted to Bury Us in BiH, but We Are Still Here”
July 24, 2026
Adem Jusic’s Death: Families Seek Truth, Seven Hospital Employees under Investigation
July 24, 2026
The Anniversary of the Crime in the Keraterm Camp in Prijedor
July 24, 2026
New Italian Rotation at the EUFOR Aviation Detachment
July 24, 2026
Chelsea and Italian Clubs interested in Kerim Alajbegovic
July 24, 2026
Traditional 460th Jumps from the Old Bridge on Sunday
July 24, 2026
Kupres Misses Out on 600 Jobs as German Investor Relocates Factory
July 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?