By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: New Hydroelectric Power Plant “Bocac Two” to start operating soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > New Hydroelectric Power Plant “Bocac Two” to start operating soon
BUSINESS

New Hydroelectric Power Plant “Bocac Two” to start operating soon

Published August 11, 2018
Share
SHARE

Hydroelectric power plant (HPP) “Bocac Two” should be on the network from September 1, according to economic studies, and it should become profitable in about 6.5 years, according to the director of the Dependent Enterprise “Hydroelectric Power Plants at Vrbas”, Nedeljko Kesic.

“HPP “Bocac Two” underwent the ‘wet test’ and it is ready for putting into operation. This is a high-quality hydroelectric power plant with two submersible aggregates of five megawatts of installed power, i.e. about 43 gigawatt hours of electricity,” said Kesic.

“We have the design project for the construction of HPP `Krupa niska ‘, we obtained the environmental impact study , and we have all the necessary documentation. In case that the competent institutions decide that the construction of HPP `Krupa niska’ is not necessary, we will not build it, and if the competent institutions that are taking part in decision-making say that we need to construct it and we obtain the concession, the Dependent Enterprise as a public company owned by the Government of the RS will construct that hydro power plant,” noted Kesic.

He also added that all power plants have their own advantages as well as disadvantages.

“Considering the fact that the western part of the RS uses 52 % of the total electricity produced in the RS while it currently produces only 5 %, which is the “Bocac One” that was constructed back in 1981, we need to ensure energy stability here, which we attempted through the change of spatial plan,” said Kesic.

He also explained that there is no longer the large HPP “Banjaluka visoka” nor HPP “Krupa” which were planned within the earlier spatial plans. Now, three smaller hydro power plants are planned, and they should improve the supply of the western part of the RS in order for it to be safer and more independent when it comes to electricity.

(Source: biznisinfo.ba)

 

Forty Percent Increase in the Price of Gas in Canton Sarajevo

Government of Canton Sarajevo decides on Increase of Prices of Electricity to Businessmen

B&H Fruit Producers winning the Russian market

UNWTO World Tourism Barometer released New List: at which Place is BiH?

Center for Recycle of used Tires to be built in Lukavac

TAGGED:#BiH#electricitycommissioningHPP Bocac Twohydro power plantsthe RS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Germany funds Weapons Registration owned by BiH Armed Forces
Next Article An Attractive Athletic of BH Roots is the biggest Star of EC in Berlin
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Minic proposes Composition of new Republika Srpska Government
January 17, 2026
BiH FM in Cairo: BiH and Egypt are Strengthening Diplomatic and Bilateral Cooperation
January 17, 2026
Union Consumer Basket Amounts to over 3,313 BAM
January 17, 2026
The Search for Missing Persons Is Being Conducted Under Increasingly Complex, Difficult, and Demanding Circumstances
January 17, 2026
Talks About Future Cooperation: FC Zeljeznicar Holds Meeting with Dzeko
January 17, 2026
Vucic, Le Pen, Netanyahu, Meloni: The Right Rallies Behind Orban Ahead Of Elections In Hungary
January 17, 2026
Future EU Members Divided Over Temporary Restrictions On Voting Rights
January 17, 2026
FMs of Egypt, Bosnia and Herzegovina discuss Regional Developments
January 17, 2026
International Winter Oldtimer Rally Today in Sarajevo
January 17, 2026
He Left New York for Sarajevo: American Reveals What Stunned Him During His First Visit to BiH
January 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?