By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Preparation of Construction of Thermal Power Plant Banovići
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Preparation of Construction of Thermal Power Plant Banovići
BUSINESS

Preparation of Construction of Thermal Power Plant Banovići

Published: December 1, 2013
Share
SHARE

TE_BanoviciThe FB&H government adopted at a session the information on activities for the preparations and realization of a program for the construction of a thermal power plant Banovići.

The information stated that it completed the production of technical documentation for this project, which includes the construction of a pre-feasibility study, which showed the justification of such a building that would include the development of the mine Banovići. To this end, more than 100 million BAM have been invested in new equipment for the mine.

With the pre-feasibility study and the decision of the FB&H government, the approximate power blocks from 200 MW have been defined. Until now, permits and approvals for the construction of the thermal power plant have been obtained, and a public call for the selection of a strategic partner in the project have been obtained. The total estimated investment value is 584.222.528 Euros, and the completion of the construction of the thermal hydro power plant is 2018, announced the Press Office of the FB&H government.

(Source: klix.ba)

The Viaduct Case is over: The Debt is repaid, and the Assets of BiH are safe
Will there be an Increase in Prices or a Cessation of Gas Supplies?
New Law in Republika Srpska Entity gives more Competence to Inspectors
Made in BiH: The Food Safety Agency protects Four Traditional BiH Products
Muranovic Family Legacy: Reviving the Art of Traditional Woodworking
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Match for the Title of World Champion: Adnan Čatić on Face TV Again on 7 December
Next Article Basketball Club Bosna Granted 100.000 BAM
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Commemoration of the 34th Anniversary of the Suffering of Bosniaks in the Susica Camp
September 26, 2026
Dragons hold a Training Session in Warsaw ahead the Trip to Bucharest
September 26, 2026
Everything You Need to Know Before the Elections: CEC Publishes Detailed Lists and Instructions for Citizens
September 26, 2026
Bosnian Diaspora Files Complaints Against Swiss Magazine Weltwoche Reporting on War Criminal Mladic
September 26, 2026
UDIK remembers the Anniversary of the Closing of the Susica Camp near Vlasenica
September 26, 2026
Sarajevo Canton Ministry of Internal Affairs is acquiring new Special Armored Vehicles
September 26, 2026
FUZIP implements Measures from the FATF Action Plan to prevent Money Laundering
September 26, 2026
Linguistic Diversity Celebrated in Gorazde for European Day of Languages
September 26, 2026
Dispute over Licenses for Professional Drivers: Who issues valid Documents
September 26, 2026
Barbarez satisfied with BiH’s Performance after Draw with Poland
September 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?