By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
BUSINESS

Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM

Published: October 1, 2026
Share
SHARE

The Federal Prime Minister and a member of the Shareholders’ Assembly of Elektroprenos Bosnia and Herzegovina, Nermin Nikšić, along with representatives of the company, officially opened the Sarajevo 12 transformer station today by cutting the ribbon, an investment worth 10.5 million BAM. The new power facility, which was largely constructed through the engagement of domestic companies, represents one of the most significant infrastructure projects for strengthening and modernizing the power grid in Sarajevo.

Nikšić emphasized that the construction of that facility is the result of mutual work and support for projects that contribute to the development of Bosnia and Herzegovina’s power system.

“I am pleased that we were able to contribute to the adoption of financial plans and the initiation of such projects. It is obvious that it is about a very important and necessary facility,” Nikšić emphasized.

He emphasized that it makes him especially happy that the largest part of the investment was realized through the engagement of domestic companies, confirming that Bosnia and Herzegovina possesses the expert personnel and capacity to execute complex infrastructure projects.

He added that the new substation will bring greater security to the Sarajevo citizens and stability in electricity supply, while also opening up opportunities for new business and investment projects in the area.

General Manager of Elektroprenos Bosnia and Herzegovina, Miro Džakula, said that the need to build the Sarajevo 12 transformer station arose from continuous development and growing electricity consumption in the Novo Sarajevo area.

Džakula recalled that this area was previously supplied from several neighboring substations, which limited network development opportunities and the connection of new users.

“Through the planning and realization of this project, a temporary solution has been replaced by a permanent and contemporary power facility. This is one of the most significant projects for strengthening and modernizing the power infrastructure in the Sarajevo region,” Džakula emphasized.

The new substation is connected to the existing 110 kV network via the Sarajevo 7 and Sarajevo 13 substations and is equipped with the most contemporary protection, management, and monitoring systems.

Two power transformers with a capacity of 40 MVA each have been installed in the facility, which ensures sufficient capacity for current needs, as well as the future development of that part of the city.

The Federal Minister of Energy, Mining, and Industry Vedran Lakić assessed that his project represents a significant contribution to a safer electricity supply and the further strengthening of Bosnia and Herzegovina’s power system.

“Sincere congratulations to the management of Elektroprenos led by Director Džakula, as well as to all members of the Management Board of Elektroprenos, and of course to shareholders, the prime ministers of both entities in Bosnia and Herzegovina,” Lakić added.

Member of the Management Board of Elektroprenos Bosnia and Herzegovina, Haris Krvavac said that the opening of the Sarajevo 12 transformer station represents an investment in the security, economy, and the future of Sarajevo, and announced the continuation of the investment cycle and new development projects by the company.

With the opening of TS Sarajevo 12, Sarajevo has gained a modern power facility that will significantly improve the security and reliability of electricity supply, relieve the existing network, and enable higher-quality development of the urban area of Novo Sarajevo and Grbavica.

Among others, the official opening of the Sarajevo 12 transformer station was attended by the Prime Minister of Sarajevo Canton, Nihad Uk, Mayor of Novo Sarajevo Municipality, Benjamina Karić, representatives of the State Electricity Regulatory Commission, Elektroprivreda BiH, members of the Management Board of Elektroprenos BiH, contractors, and business partners.

 

American giant Amazon could soon enter the Bosnia and Herzegovina Market more strongly?
BH Telecom claims it is Technologically ready to launch 5G Network
Possible Opening of Bosnia-Herzegovina’s Foreign Trade Chamber in Brussels
Government of FB&H changed the Decree about the Daily Turnover
What makes Bosanska Krupa favorable for Investors?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Dodik after Moscow: I proposed an advisory body for Republika Srpska and Russia
Next Article Dragons completed the last Training Session before the Match with Sweden
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Filipovic and Becirovic host a Reception for BiH Statehood Day
November 25, 2026
Sarajevo Opens Registration for 2027 Races as Half Marathon Marks 20th Anniversary
November 25, 2026
Qatar Airways trims Belgrade and Zagreb Plans, eyes Sarajevo Return
November 25, 2026
BiH Statehood Day in Mrkonjic Grad: 83 Years Since the Historic Session of ZAVNOBiH
November 25, 2026
Members of BiH Karate Association won 38 Medals at the Tournament in Bar
November 25, 2026
Acting High Representative Louis Crishock extends his Congratulations to all Citizens of BiH
November 25, 2026
OSCE: Citizens of BiH Want Better Interethnic Relations, but Don’t Have Enough Trust in Institutions
November 25, 2026
Women in the Foundation of BiH Statehood – Participated in Its Reconstruction, Yet Remained in the Shadow of Political Power
November 25, 2026
Non-working Day in the Federation of BiH, RS does not celebrate BiH Statehood Day
November 25, 2026
Wizz Air to launch New Route from Sarajevo
November 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?