By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
BUSINESS

Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM

Published: October 1, 2026
Share
SHARE

The Federal Prime Minister and a member of the Shareholders’ Assembly of Elektroprenos Bosnia and Herzegovina, Nermin Nikšić, along with representatives of the company, officially opened the Sarajevo 12 transformer station today by cutting the ribbon, an investment worth 10.5 million BAM. The new power facility, which was largely constructed through the engagement of domestic companies, represents one of the most significant infrastructure projects for strengthening and modernizing the power grid in Sarajevo.

Nikšić emphasized that the construction of that facility is the result of mutual work and support for projects that contribute to the development of Bosnia and Herzegovina’s power system.

“I am pleased that we were able to contribute to the adoption of financial plans and the initiation of such projects. It is obvious that it is about a very important and necessary facility,” Nikšić emphasized.

He emphasized that it makes him especially happy that the largest part of the investment was realized through the engagement of domestic companies, confirming that Bosnia and Herzegovina possesses the expert personnel and capacity to execute complex infrastructure projects.

He added that the new substation will bring greater security to the Sarajevo citizens and stability in electricity supply, while also opening up opportunities for new business and investment projects in the area.

General Manager of Elektroprenos Bosnia and Herzegovina, Miro Džakula, said that the need to build the Sarajevo 12 transformer station arose from continuous development and growing electricity consumption in the Novo Sarajevo area.

Džakula recalled that this area was previously supplied from several neighboring substations, which limited network development opportunities and the connection of new users.

“Through the planning and realization of this project, a temporary solution has been replaced by a permanent and contemporary power facility. This is one of the most significant projects for strengthening and modernizing the power infrastructure in the Sarajevo region,” Džakula emphasized.

The new substation is connected to the existing 110 kV network via the Sarajevo 7 and Sarajevo 13 substations and is equipped with the most contemporary protection, management, and monitoring systems.

Two power transformers with a capacity of 40 MVA each have been installed in the facility, which ensures sufficient capacity for current needs, as well as the future development of that part of the city.

The Federal Minister of Energy, Mining, and Industry Vedran Lakić assessed that his project represents a significant contribution to a safer electricity supply and the further strengthening of Bosnia and Herzegovina’s power system.

“Sincere congratulations to the management of Elektroprenos led by Director Džakula, as well as to all members of the Management Board of Elektroprenos, and of course to shareholders, the prime ministers of both entities in Bosnia and Herzegovina,” Lakić added.

Member of the Management Board of Elektroprenos Bosnia and Herzegovina, Haris Krvavac said that the opening of the Sarajevo 12 transformer station represents an investment in the security, economy, and the future of Sarajevo, and announced the continuation of the investment cycle and new development projects by the company.

With the opening of TS Sarajevo 12, Sarajevo has gained a modern power facility that will significantly improve the security and reliability of electricity supply, relieve the existing network, and enable higher-quality development of the urban area of Novo Sarajevo and Grbavica.

Among others, the official opening of the Sarajevo 12 transformer station was attended by the Prime Minister of Sarajevo Canton, Nihad Uk, Mayor of Novo Sarajevo Municipality, Benjamina Karić, representatives of the State Electricity Regulatory Commission, Elektroprivreda BiH, members of the Management Board of Elektroprenos BiH, contractors, and business partners.

 

Company established by a Bosnian from Diaspora makes Success in Denmark
Business Forum B&H -Pakistan in Sarajevo
Impressions after the Conference in Srebrenica
The IMF confirmed: Tranche of 148.2 Million BAM in the first two Months of 2018
The Authorities in Sarajevo Announce New Mega Road Projects, but Cannot Finalize the Existing Ones
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Dodik after Moscow: I proposed an advisory body for Republika Srpska and Russia
Next Article Dragons completed the last Training Session before the Match with Sweden
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Dzeko emotionally says Goodbye after 152 Games and 73 Goals
October 2, 2026
Dzeko’s Farewell ends in a Draw as BiH hold Sweden to 1-1
October 2, 2026
Indonesia celebrates 81st Independence Anniversary, highlights strong Ties with BiH
October 2, 2026
The Future Does Not Belong to the Silent
October 2, 2026
Acting HR meets newly appointed Brcko District’s Chief Prosecutor
October 2, 2026
School in Srebrenica Bans Students from Wearing BiH National Team Jerseys
October 2, 2026
Barbarez selects 23 Players for the Match against Sweden
October 2, 2026
Dzeko ahead of National Team Farewell: “I wouldn’t change my Decision; it’s Time”
October 2, 2026
BH UK Network: Death of Biljana Plavsic Must Not Diminish Gravity of Her Crimes
October 2, 2026
BiH FM at the Meeting of the Berlin Process: European Principles and Unblocking the Road to BiH are Two Tests of the EU’s Credibility
October 2, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?