By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR
OTHER NEWS

Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR

Published: February 15, 2017
Share
SHARE

motorway5The route of the fast road Lasva Nevic Polje is part of the new expanded European network of fast roads, the so-called route 2A Lasva Travnik Jajce Banja Luka and it is very significant since it will connect the central part of BiH with the highway on Corridor 5-C, this will significantly improve the conditions of the traffic along the direction of Sarajevo, Banja Luka, said Director of the PC Highways of FBiH, Adnan Terzic.

It is very important, he said, that this route increases the level of traffic communication of Krajina.

On how many lots will be divided construction of the first part of the fast road, he said, will depend on the financial resources. As envisaged by the Plan for construction, added Terzic, the tender will follow very soon. With the main project is planned to start construction on Lasva loop of Corridor 5 and ends on the loop Nevic-Polje near Travnik.

“Study of expropriation was made, the experts analyzed all parcels and objects that need to be removed from the route, and it is about 124 facility. Also, in December last year, PC Highways of FBiH announced the purchase of the preliminary design and study documentation for continuation of fast road Travnik (loop Nevic Polje) – Jajce (loop Bravnice temporary circuit on M-5), which includes the conceptual design, traffic study based on preliminary design, environmental impact studies, studies on obtaining prior water approval and feasibility studies of fast road,” said Terzic.

Section Lasva -Nevic Polje is 25 kilometers long and it is a fast road with two separate traffic line, each with two traffic lanes that are three and a half meters wide. The main structure of the construction of three tunnels and 18 bridges and viaducts. In this part are planned four loops (Lasva, Kaonik, Vitez and Nevic Polje).

“The construction of the fast road Lasva-Nevic Polje should cost 183 million EUR, and in consultation with the Government of FBiH, we will arrange different sources of funding,” said Terzic.

(Source: klix.ba)

Indictment filed against Milenko Gojgolovic for War Crimes
TRT donated Equipment worth 500,000 EUR to BHRT
Court of Bosnia-Herzegovina delivered a Judgement in Case of Ernad Nukic et al. for Organized Crimes
EUFOR signed MoU with Zenica Cantonal Hospital
Impressive Act of a young Sarajevo Policeman: He helped an elderly Woman cross the Street
TAGGED:#funds#Lasva#travnikCorridor 5Cfast road
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sarajevo: elderly couple on Valentine’s Day
Next Article How Dado Delic from BiH crossed 11,500 kilometers with Bicycle?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Conference on modern Security Challenges held in the Parliamentary Assembly of BiH
June 25, 2026
Interview with Commander of NATO HQ Sarajevo Brigadier General James Fowler: Stronger Defense Reforms Key to BiH’s NATO Path
June 25, 2026
EU and Council of Europe launch Project to strengthen the Institutional Capacity of the Constitutional Court of BiH
June 25, 2026
Sarajevo Airport has completely adapted its Infrastructure to People with reduced Mobility
June 25, 2026
A Strong Message from Germany: “Dodik and Trump Administration Pose the Main Threat to BiH”
June 25, 2026
Balkan Gets a New “Country”
June 25, 2026
The New Great Game in the Balkans
June 25, 2026
Key Financial Institutions Send a Joint Message: Retail Deposits Are Safe, BiH Financial Sector Remains Stable
June 25, 2026
BiH among the Top Polluters, Thermal Power Plants for Years Breach the Emission Limits
June 25, 2026
Deputy Minister of FA participates in the ASPEN Working Group for the WB
June 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?