By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR
OTHER NEWS

Terzic: Construction of Fast Road from Lasva to Travnik will cost 183 million EUR

Published February 15, 2017
Share
SHARE

motorway5The route of the fast road Lasva Nevic Polje is part of the new expanded European network of fast roads, the so-called route 2A Lasva Travnik Jajce Banja Luka and it is very significant since it will connect the central part of BiH with the highway on Corridor 5-C, this will significantly improve the conditions of the traffic along the direction of Sarajevo, Banja Luka, said Director of the PC Highways of FBiH, Adnan Terzic.

It is very important, he said, that this route increases the level of traffic communication of Krajina.

On how many lots will be divided construction of the first part of the fast road, he said, will depend on the financial resources. As envisaged by the Plan for construction, added Terzic, the tender will follow very soon. With the main project is planned to start construction on Lasva loop of Corridor 5 and ends on the loop Nevic-Polje near Travnik.

“Study of expropriation was made, the experts analyzed all parcels and objects that need to be removed from the route, and it is about 124 facility. Also, in December last year, PC Highways of FBiH announced the purchase of the preliminary design and study documentation for continuation of fast road Travnik (loop Nevic Polje) – Jajce (loop Bravnice temporary circuit on M-5), which includes the conceptual design, traffic study based on preliminary design, environmental impact studies, studies on obtaining prior water approval and feasibility studies of fast road,” said Terzic.

Section Lasva -Nevic Polje is 25 kilometers long and it is a fast road with two separate traffic line, each with two traffic lanes that are three and a half meters wide. The main structure of the construction of three tunnels and 18 bridges and viaducts. In this part are planned four loops (Lasva, Kaonik, Vitez and Nevic Polje).

“The construction of the fast road Lasva-Nevic Polje should cost 183 million EUR, and in consultation with the Government of FBiH, we will arrange different sources of funding,” said Terzic.

(Source: klix.ba)

Living Conditions in Vucjak Reception Camp have become even more inhumane now Temperatures have dropped below Freezing

Sarajevo to be a City with a Zero Pollution Rate by 2030?

Negative Natural Growth was recorded in all Cantons in FBiH

Air in Sarajevo “very unhealthy” again, Polluted Particles 8 Times higher than Prescribed

Woman from Dalmatia about Tourists: Bosnians are my favorite Guests

TAGGED:#funds#Lasva#travnikCorridor 5Cfast road
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sarajevo: elderly couple on Valentine’s Day
Next Article How Dado Delic from BiH crossed 11,500 kilometers with Bicycle?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Strong Reactions from Croats in BiH to Becirovic’s Statement over Election of a Member of the Presidency
April 23, 2026
Political Blockades cost BiH Hundreds of Millions of Euros in EU Funds
April 23, 2026
The Presidency adopted: The Southern Interconnection Project with Croatia can begin
April 23, 2026
Snow fell on Jahorina Mountain
April 23, 2026
Five Million BAM for Pretis Company to build a Facility for the Production of Explosives
April 22, 2026
BiH young eco-innovators receive Awards in Europe House
April 22, 2026
Ambassador Castellani to Cheer for BiH at World Cup After Symbolic Jersey Exchange
April 22, 2026
Forto Warns: The Reform Agenda is Fading from Public Eye Despite Millions at Stake
April 22, 2026
Softic and Neskovic: It’s Time to Unblock the House of Peoples
April 22, 2026
False Reports of Bombs in 17 Schools across Bosnia and Herzegovina
April 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?