By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The biggest Post-War Investment: A new Reactor arrived in GIKIL
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The biggest Post-War Investment: A new Reactor arrived in GIKIL
BUSINESS

The biggest Post-War Investment: A new Reactor arrived in GIKIL

Published: June 6, 2023
Share
SHARE

At the maleic anhydride (AMK) factory in GIKIL, the implementation of the project to increase the production capacity of the factory is underway. Along with the acquisition of the reactor, it is the largest post-war investment whose work will begin in 2021, and the full transition to production with a new reactor is planned for 2024.

“Following the latest technologies, with the aim of increasing the production capacity, from the current 10,000 to 13,000 tons, and with the possibility of increasing the annual capacity to 15,000 tons, all in order to achieve the highest yield and selectivity, reduce the creation of unwanted side products and better use of the distillation system, GIKIL opted for a modern single-zone reactor of larger dimensions with the best possible performance. The old reactor, which was commissioned back in 1984, reached the end of its working life at least 15 years ago. However, apparently there was never enough will or funds to replace it all and ensure the healthy operation of the factory, until now, which in itself says how big and important this investment is,” said Almin Suljić, executive director for production at GIKIL.

Currently, the first phase is completed, which includes the provision of basic engineering to increase production.

“Basic engineering included the replacement of the reactor, which, therefore, has not been changed for 40 years, then the replacement of the compressor, the replacement of the tank for clean AMK and the installation of a new tank for raw AMK. Furthermore, it is planned to replace the salt tank, replace the gas cooler and aftercooler, replace the superheater of the boiler room water, distiller heater and butane evaporator heater. The plan is to replace the pumps, install an acid cooler and a fourth pastilator, upgrade the automatic control system, and replace the transformer and expand the butane storage from 1,000 to 2,000 cubic meters,” explains Ermin Mujkić, director of the AMK factory.

Along with the project to increase the production of the factory, work is being done on another very important project.

“It is about a project for the treatment of technological waste water from the production process. As part of basic engineering, the project includes the separation of the solid part of fumaric acid from technological waste water and its commercial use. The treatment of the resulting filtrate is the second phase of the project, and we will deal with this separately from at the end of August,” Mujkic said.

The maleic anhydride factory began operating in 1979 with benzene as a raw material, and the entire process was based on the catalytic reaction of benzene oxidation. Since 2006, the raw material has been replaced and environmentally friendly n-butane has been used since then, GIKIL announced.

Hand-made Lamps from Doboj to become a Brand
Which bottled Water in BiH contained Bacteria that are not allowed?
German Giant to expand its Production Plant in Herzegovina
Significant Decrease in Prices of Fuel in Bosnia and Herzegovina
Austrians to build the Largest Solar Power Plant in BiH
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Public Debt of Bosnia and Herzegovina amounts to over Thirteen Billion BAM
Next Article Political Directors of Members of the Peace Implementation Council to meet in Sarajevo
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Becirovic with the UN SG: The Resolution and the ‘Flower of Srebrenica’ Monument are a lasting Legacy
September 21, 2026
Puerto Flamenco Concludes BiH Mini-Tour with Final Performance in Tuzla
September 21, 2026
Media close to Juventus: Alajbegovic’s Rise changes Juventus’s Plans
September 21, 2026
Case “Catering”: Proposed Extension of Detention for Arnautovic and Others for another Two Months
September 21, 2026
The Head Coach of the Football Team of BiH holds a Conference ahead of Matches
September 21, 2026
31st Anniversary of the Sasina Atrocity Marked: Families Demand Prosecution of Those Responsible
September 21, 2026
More and More People in a Difficult Financial Situation: Thousands of BiH Citizens Come to Soup Kitchens for a Meal
September 21, 2026
Frozen Accounts, uncertain Wages, Unions stand with BiH Public Broadcaster
September 21, 2026
Minister Amidzic’s scandalous Statement: “I would take Bosniak Politicians to Church, I have never felt Hatred like in Sarajevo”
September 21, 2026
What is the Average Monthly paid Net Salary in BiH?
September 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?