By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Three World Companies in Race for Construction of Block 7 of Power Plant ‘Tuzla’
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Three World Companies in Race for Construction of Block 7 of Power Plant ‘Tuzla’
BUSINESS

Three World Companies in Race for Construction of Block 7 of Power Plant ‘Tuzla’

Published: May 27, 2013
Share
SHARE

Tuzla_panorama_1The company ‘Elektroprivreda BiH’ will officially open on 24 June offers for the most serious candidates that will enter the short list for the selection of project partners for a joint venture in the construction of Block 7 of the power plant ‘Tuzla’, according to portal Tip.ba.

This was confirmed to ‘Dnevni Avaz’ by the General Director of ‘Elektroprivreda BiH’ Elvedin Grabovica, who said that this involves world consortiums, but that he cannot reveal the names of the companies at this time.

“Before the opening of the offer, I cannot say anything, because I do not know who has met the requirements and which companies will enter into the final race. I only know that this is a serious consortium. We will know everything at the end of June. These are global well-known companies in this area’’, said Grabovica.

The construction of Block 7 is the biggest post-war investment project, which is worth 1,5 billion KM, and in which ‘Elektroprivreda BiH’ will participate with a primary capital of 25 percent.

“I think that three companies will pass the final phase, and after that these companies are required to submit a final offer, more specifically the price of the construction of Block 7. Here is where models and building technologies will be evaluated, as well as conditions for financing. They must provide evidence that there will be financing for the entire project’’, said Grabovica. He added that ‘Elektroprivreda BiH’ has the condition that companies that wish to build Block 7 cannot be majority owners.

According to Grabovica, the companies that want a majority stake cannot get into the short list, nor will they actually participate in the construction.

The criteria for pre-qualification of the first phase of the project partners was met by companies such as ‘Siemens’, ‘Hitachia’, ‘Cobra’ from Spain, followed by ‘Croatian Elektroprivreda’ in consortium with Japanese ‘Toshiba Corporation’, and the Polish company ‘Rafako’, ‘Cengiz Enerji Sanayii ve Ticaret’ from Turkey.

Grabovica told ‘Dnevni Avaz’ that ‘Elektroprivreda BiH’ has still not signed a tender for the sale of surplus energy.

“We are waiting to see how prices will move. I think that in August we will announce the tender. It would not be worth now to sell electricity, because it is cheap. We are waiting for prices to increase’’, he said.

Chicken Meat from BiH to be in the EU soon? 
Analysis: Total deposits of domestic sectors in BiH
Vispak’s ”zlatna džezva’’ in Varaždin on Saturday
Fuel has become cheaper again in Bosnia and Herzegovina
Tolksdorf: BH Companies are very Reliable Partners to German Companies
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sarajevo Jazz Guerilla on 27 May in Sarajevo
Next Article BiH Deputy Minister of Foreign Affairs Participated at Ministerial Meeting of Adriatic-Ionian Initiative
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Bosnia’s Ruling Coalition Nears End of Mandate with Few Promises Delivered
July 27, 2026
BiH Exhausts Annual Foreign Worker Quota as Businesses Call for Labor Market Reform
July 27, 2026
Association of Independent Intellectuals Problematizes Design of Ballots for the Presidency of Bosnia and Herzegovina
July 27, 2026
Letter by the London Mayor: “Being in Srebrenica is a deeply moving Experience I will carry with me for the rest of my life”
July 27, 2026
Solomun Wraps Up the Sarajevo Film Festival Once Again: “Sarajevo, I Missed You”
July 27, 2026
Russian Embassy: We are deeply shaken by the Tragedy of Mountaineers from BiH
July 27, 2026
Krnic and Kazic Crowned Champions at 460th Traditional Old Bridge Diving Competition in Mostar
July 26, 2026
BiH introduces New Ballots without Candidate Names for 2026 General Elections
July 26, 2026
Interview with Governor of Central Bank of BiH: With the Instant-Payment System, the Money Will Arrive in Accounts in Seconds
July 26, 2026
Historic Success for BiH Physicists in Colombia: All National Team Members Return with Awards
July 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?