By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Unfulfilled nuclear Ambitions of Yugoslavia: From the Power Plant and Heating Plant in BiH to the Atomic Bomb
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Unfulfilled nuclear Ambitions of Yugoslavia: From the Power Plant and Heating Plant in BiH to the Atomic Bomb
OTHER NEWSOUR FINDINGS

Unfulfilled nuclear Ambitions of Yugoslavia: From the Power Plant and Heating Plant in BiH to the Atomic Bomb

Published January 6, 2022
Share
SHARE

In the midst of the energy crisis, the issue of nuclear energy has become relevant again. It was considered that Bosnia and Herzegovina (BiH) produces electricity from this type of energy. Energoinvest was asked to engage in the development of the atomic bomb.

The former Yugoslavia had ambitious goals in using nuclear energy for civilian and military purposes. This included the construction of several nuclear power plants and the development of atomic weapons.

It has been more successful in using nuclear energy to produce electricity than in developing nuclear weapons. There was an attempt of making an atomic bomb here, but it failed.

The Krsko nuclear power plant, which supplies electricity to Slovenia and Croatia, was put into operation in 1981. It was the only power plant of its kind built by the Yugoslav government.

It is important to mention that the intention was for the next such power plant to be built in Prevlaka, Croatia, and which would produce electricity for both Croatia and Slovenia. Slovenia later gave up.

The growing economic crisis in Yugoslavia and the Chernobyl nuclear disaster in 1986 made Krsko the only nuclear power plant.

Meanwhile, the industrial giant with tens of thousands of workers Energoinvest considered the possibility of building such plants in BiH. Sarajevo and Gorazde were mentioned as locations for their construction.

In the book “Dzemal Bijedic: Political Biography”, historian Husnija Kamberovic, referring to Oslobodjenje’s papers on January 22nd, 1970, noted that Energoinvest proposed the construction of a nuclear heating plant in early 1970 to heat Sarajevo.

In a 2002 monograph on Energoinvest creator Emerik Blum, Muhamed Cico, Izudin Filipovic, Safet Hasanbegovic, Zarko Primorac, and Sefik Vucijak pointed out that Blum was thinking about building a nuclear power plant in Gorazde.

Primorac, who was one of his associates, testified about that. Primorac recounted a conversation with Blum, whom he visited at the Fojnica health resort.

In an interview with Jutarnji list in 2016, the former director of Energoinvest and the Yugoslav Minister of Science, Bozidar Matic, pointed out that Yugoslavia secretly worked on the development of the nuclear bomb in the 1980s. According to him, this is a nuclear program codenamed “Sutjeska”, in which Energoinvest played an important role.

Also, he said that Yugoslavia had signed agreements with Iraq and Libya to build a rocket for which he mentioned was intended for an atomic bomb. According to Matic, the idea was to make a rocket with a range of up to 300 kilometers and that it should be tested in the area from Siroki Brijeg to Herceg Novi.

 

E.Dz.

Source: Klix.ba

What does a Day in the Life of a SIPA Officer look like?

U.S. To Provide Psycho-Social Support To Flood Victims

Sarajevo War Tunnel – Twenty Years Later

Everything is Ready for Opening of Gazi Husrev-Beg Library

The Weather Forecast for Tomorrow

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Pensioners dissatisfied with the Allowance of 50 BAM
Next Article Puljic: All human Wisdom and Knowledge stop in front of the Bethlehem Manger
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Lavrov warns: NATO is preparing for Military Intervention in Ukraine
February 6, 2026
The US and Iranian Delegations in Oman discussed the Iranian Nuclear Program
February 6, 2026
Prosecution in Milan Opens Case Against Giuseppe Vegnaduzzo, First Suspect in “Sarajevo Safari” Investigation
February 6, 2026
OSCE Chairman-in-Office and Secretary General visit Moscow
February 6, 2026
Covic: There Is Still Time to Resolve the Issue of Electing the Croat Member of the Presidency
February 6, 2026
BiH FM in Helsinki: Finland confirms its support for BiH’s European Path
February 6, 2026
The Cost of Groceries in Occupied Sarajevo and Profiting from People’s Suffering
February 6, 2026
The Night of the Largest Police Operation in BiH: How 600 Officers Raided Gornja Maoca
February 6, 2026
Milano – Cortina 2026 Winter Olympic Games Open, Showcasing Italy’s Vision of Sport, Peace and Global Cooperation
February 6, 2026
Bjelasnica Mountain to Host FIS European Cup in Super-G
February 6, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?