By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: What is the First Step towards the Construction of the Adriatic-Ionian Motorway?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > What is the First Step towards the Construction of the Adriatic-Ionian Motorway?
BUSINESS

What is the First Step towards the Construction of the Adriatic-Ionian Motorway?

Published: May 17, 2016
Share
SHARE

Euroasfalt Working on Highway in Slovenia sa-c.netThe Ministry of Transport and Communications (MTC) of BiH announced a public tender for drafting of project documentation based on which will be built the Adriatic-Ionian motorway, part of which will pass through BiH, thus state institutions made the first big step towards the revival of this great infrastructure project.

The Adriatic-Ionian motorway, whose construction is expected to start before 2020, has special importance, almost equal to the importance of Corridor 5C.

First of all, because it will be passing through five, maybe even seven countries, it will connect the South Europe with Central and Western Europe, enable stronger development of seaports in several countries, and certainly because of open possibilities of its connection to the “Silk Road” through Turkey, all the way to China! Ministry secured about 4.4 million BAM for technical project documentation, but, according to them, we will know the details in the summer of next year.

“The documentation should be completed by mid-2017, when we will get concrete facts, such as the best route, required time of construction, the total cost of the project, and the degree of viability and feasibility of the project,” as announced from the Ministry. They further stated that they are “only at the beginning of the study of technical, economic, social, financial and environmental studies of feasibility sustainability of the project.”

“The task of the selected consultant will be the preparation of technical studies, missing spatial planning documents, variants of conceptual design with multi-criteria analysis, previous studies of environmental impact, traffic studies and the previous feasibility studies, according to the needs of the contracting authority and the funds that are available in the budget. It should be noted that the Council of Ministers of BiH adopted a conclusion to build this highway through a public-private partnership, which, of course, includes the possibility of using EU funds,” as stated from the Ministry.

Route along which that motorway would pass through BiH is: Pocitelj – Neum – Trebinje – border with Montenegro, and the key issue in terms of determining the route is detailing.

13187709_1770797623156914_1127776665_n“On the terrain, where the motorway would pass, there would not be a lot of expropriation, but the fact is that this is a difficult terrain, with a lot of tunnels and viaducts. It means that the price would be about 20 million BAM per linear kilometer,” said Seval Kovacevic, expert and a certified court expert of traffic engineering.

According to this calculation, the highway that would connect BiH on its south with the rest of the developed world, as well as the south Greece with Central and Western Europe, would cost about 2.280 billion BAM, and we would be able to withdraw good part of the funds from the EU funds, but also “through” Croatia, which is a member of the EU, and has a great interest in this large project.

(Source: akta.ba)

City in Bosnia and Herzegovina Offers Apartments for One BAM per Square Meter
The Ministry published the entire Documentation on the Quarry in Donja Jablanica
The U.S. Ambassador explains the Severity of economic Sanctions to Politicians
The construction of Fast Road Lasva Travnik to begin soon
Villages in Bosnia and Herzegovina can be a New Tourist Brand
TAGGED:#border#Montenegro#motorway#public#route#tender
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Charter of Ban Kulin: Visit to Dubrovnik Museum
Next Article Talgo Trains soon on the Railroads of BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

From Srebrenica to St. Louis: Refugee Brothers Honor Their Roots Through Achievement and Resilience
May 22, 2026
Bosnia and Herzegovina Marks 34 Years of United Nations Membership
May 22, 2026
Magyar assures Becirovic: Hungary seeks Relations founded on Respect
May 22, 2026
Radoncic: SBB will return, we are running for a Member of the BiH Presidency
May 22, 2026
BiH FM to participate at GLOBSEC Forum 2026
May 22, 2026
Duran sentenced to 43 Years in Prison for the Murder of Nadira Sahacic
May 22, 2026
Intensifying Cooperation between the judiciary of BiH and Croatia
May 22, 2026
Former Workers of the Zenica Brown Coal Mine threaten Hunger Strike
May 22, 2026
Anniversary of the Death of Twelve Babies over Lack of Oxygen in Banja Luka
May 22, 2026
BiH FM Files a Criminal Complaint Regarding the Opening of the Border Crossing in Bosanska Gradiška
May 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?