By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 235 Million BAM needed for the First Transversal
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 235 Million BAM needed for the First Transversal
BUSINESS

235 Million BAM needed for the First Transversal

Published March 25, 2016
Share
SHARE

12895534_1136637599720528_2126740883_nInstitute for Construction of the Sarajevo Canton is working together with the Directorate for Roads of the Sarajevo Canton on the analysis of costs for the construction of the First transversal, after which the cantonal Ministry of Transportation will decide which section will be constructed first.

“We are working on two analyses: analysis of costs of construction and the solving of legal and property issues, which should be done in a month. The analyses are being conducted for the sections from the street of Silvije Strahimir Kranjčević to Velešići, then to the roundabout Bare, and from Bare to Hotonj,” said Anka Petrović from the Institute for Construction of the Sarajevo Canton.

According to Petrović, the final calculation will show the exact value of construction by sections, how many facilities for expropriation are there, where the substitute facilities will be built and for which section the credit funds from the World and the European Bank for Reconstruction and Development will be provided first.

For now, it is known that the substitute residential facilities will be built on Šip, but the exact parcel on which the new buildings will be built is unknown.

The First transversal plays a significant role in the formation of the road network in the Canton. Its construction was planned in the Urban Plan of the City of Sarajevo back in 1985 and it was ranked as the primary city road with the greatest significance in the network of road infrastructure in the wider city area of all other transversals. It will connect the Zagrebačka Street, i.e. the Northern longitudinal, with the future city highway next to the Railway Station and with Vogošća.

From Vogošća, the transversal continues to Hotonj, i.e. it is connected to the main road M-18 all the way to Jošanica – to the crossroad for Tuzla and connection to the highway A1. As the Directorate for Roads of the Sarajevo Canton stated, length of the First transversal is 9.1 kilometer. According to the project, the costs of construction amount to 175 million BAM, while the expropriation of land costs around 60 million BAM.

(Source: akta.ba)

SPARK Innovation Hack Winners announced

What is the Average Salary in BiH in October?

Municipality of Konjic developing Economic Environment for New Investors

Gas Prices in BiH Higher from Today?

Government subsidizes the Purchase of Firewood for Pensioners

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Watch the Announcement of the Verdict for Radovan Karadžić!
Next Article Electricity cheaper between 2 p.m. and 5 p.m.
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The Dragons will play a friendly against Panama ahead of the World Cup
May 5, 2026
Announcement Date Set for Sergej Barbarez’s Squad List for the 2026 World Cup
May 5, 2026
Witnesses to the Biljani Massacre: 258 killed in one Day, Neighbors were the Executors
May 4, 2026
One-month Detention ordered for Tarik Prusac, suspected of Murdering his Wife
May 4, 2026
BiH adopts Key Law to avoid MONEYVAL Grey List
May 4, 2026
The World Health Organization says the Risk of Hantavirus to the General Public is Low
May 4, 2026
Multidisciplinary “Think Freedom” Exhibition by Edina Seleskovic Opens at Europe House
May 4, 2026
Milk Is Imported to Bosnia and Herzegovina While Farmers Are Forced to Dump Domestic Milk
May 4, 2026
The Fourth Salamander Trail to Be Held in Rudo at the End of October
May 4, 2026
Over 65% of Domestic Violence Verdicts End in Suspended Sentences Despite Brutal Abuse Cases
May 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?