By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 7.5 Million BAM for Infrastructure Projects in Mostar
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > 7.5 Million BAM for Infrastructure Projects in Mostar
OTHER NEWS

7.5 Million BAM for Infrastructure Projects in Mostar

Published: June 11, 2016
Share
SHARE

worksEmir Nuspahić from the Department of Urbanization and Construction of the Office for Infrastructure Issues of the City of Mostar revealed information about the most important infrastructure projects in the field of roads in the City of Mostar.

In addition to the continuation of construction of collectors which are being built in the body of city roads (Boulevard and Maršala Tita Street), including reconstruction of those roads, also foreseen is the reconstruction of the Kralja Tvrtka Street, with the construction of two roundabouts in the same street. Reconstruction also covers the underground installations and estimated value of those works is 500.000 BAM.

Also reconstructed will be the Maršala Tita Street on the section along the Sjeverni logor, as well as number of roads in Sjeverni logor. Those works include only the upper layer of the road and the replacement of sidewalks, and their total estimated value is 400.000 BAM.

The value of the entire reconstruction of water and sewerage infrastructure and paving of Fejićeva Street, with the belonging fittings, amounts to three million BAM.

Construction of the road from the new bridge on the extension of the Avenue to the Maršala Tita Street includes the construction of a pedestrian underpass, drainage, pedestrian trails and public lighting, and their estimated value is 3.5 million BAM. Construction of a roundabout near the facility “Mljekara” includes the reconstruction of underground installations.

Reconstruction of a section of the local road L13 in Podveležje includes reconstruction of the upper layer of the road, with necessary extensions with the aim of enabling the transportation of equipment for the wind power plant, Nuspahić stated.

(Source: akta.ba/photo: abcmagazin.info)

Suad Beslic returned from Germany to BiH and now manufactures Fire Trucks
Wildfires raging again near Mostar, Extinguishing difficult due to Mines
The Identity of the killed Woman and the Suspect in the Murder in Gradacac is known
Everything is Ready for Elections
Penalty up to 1,000 BAM for wanton Driving?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Why is the Proposal by the European Commission inacceptable for the RS?
Next Article Frozen Raspberries in the first IQF Tunnel in BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

POSKOK files Indictment against former Director of FBiH Motorways
September 24, 2026
Energy Transition: Power Utility of BiH and the Universal Energetics Sign Memorandum of Understanding
September 24, 2026
BiH FM Participates in the Working Meeting of the Partnership Commission of the US – Adriatic Charter
September 24, 2026
OSCE PA prepares to deploy Election Observation Mission to Bosnia and Herzegovina
September 24, 2026
SIPA on ‘Tihor’ Operation following which an Interior Ministry employee committed Suicide
September 24, 2026
Central Election Commission fines Political Parties for Premature Campaign
September 24, 2026
DCOM EUFOR Visits Armed Forces of Bosnia and Herzegovina Training and Doctrine Command
September 24, 2026
BiH Foreign Minister: Membership in the European Union remains a strategic Goal of BiH
September 24, 2026
Two People died after serious Injuries sustained in a Fire in a Nursing Home
September 24, 2026
Zenica Miners continue their Hunger Strike
September 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?