By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 7.5 Million BAM for Infrastructure Projects in Mostar
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > 7.5 Million BAM for Infrastructure Projects in Mostar
OTHER NEWS

7.5 Million BAM for Infrastructure Projects in Mostar

Published: June 11, 2016
Share
SHARE

worksEmir Nuspahić from the Department of Urbanization and Construction of the Office for Infrastructure Issues of the City of Mostar revealed information about the most important infrastructure projects in the field of roads in the City of Mostar.

In addition to the continuation of construction of collectors which are being built in the body of city roads (Boulevard and Maršala Tita Street), including reconstruction of those roads, also foreseen is the reconstruction of the Kralja Tvrtka Street, with the construction of two roundabouts in the same street. Reconstruction also covers the underground installations and estimated value of those works is 500.000 BAM.

Also reconstructed will be the Maršala Tita Street on the section along the Sjeverni logor, as well as number of roads in Sjeverni logor. Those works include only the upper layer of the road and the replacement of sidewalks, and their total estimated value is 400.000 BAM.

The value of the entire reconstruction of water and sewerage infrastructure and paving of Fejićeva Street, with the belonging fittings, amounts to three million BAM.

Construction of the road from the new bridge on the extension of the Avenue to the Maršala Tita Street includes the construction of a pedestrian underpass, drainage, pedestrian trails and public lighting, and their estimated value is 3.5 million BAM. Construction of a roundabout near the facility “Mljekara” includes the reconstruction of underground installations.

Reconstruction of a section of the local road L13 in Podveležje includes reconstruction of the upper layer of the road, with necessary extensions with the aim of enabling the transportation of equipment for the wind power plant, Nuspahić stated.

(Source: akta.ba/photo: abcmagazin.info)

Service for Foreigners Affairs relocated Migrants staying in Sarajevo
Bosnian Vanja Crnojevic helps People affected by Explosion in Beirut
A Drill to be held at the Sarajevo International Airport
Border Police Officer arrested for Corruption
Turkey plans to assist Bosnia’s Defense Ministry with 43 Million BAM
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Why is the Proposal by the European Commission inacceptable for the RS?
Next Article Frozen Raspberries in the first IQF Tunnel in BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Anniversary of the Death of Twelve Babies over Lack of Oxygen in Banja Luka
May 22, 2026
BiH FM Files a Criminal Complaint Regarding the Opening of the Border Crossing in Bosanska Gradiška
May 22, 2026
Belgium launches Investigation into ‘Sniper Safaris’ during Bosnian War
May 22, 2026
Federal Ministry of Transport – More than 21 Million BAM for road Infrastructure
May 22, 2026
Deadline for Submission of Applications for Certification of Political Parties expires Today
May 22, 2026
Travnik demonstrates a high Level of Readiness with “Lasva 26” Demonstration Exercise
May 22, 2026
EUFOR Commander Engages Students in Dialogue on Security, Stability, and BiH’s Future
May 22, 2026
Euphoria in Sarajevo: “The Dragons” at the World Cup Spark a True Panini Sticker Frenzy
May 22, 2026
Nordic Countries Reaffirm Support for Bosnia and Herzegovina at Sarajevo Reception
May 21, 2026
“No Room for Impunity”: Austria Opens Probe Into Alleged Sarajevo Sniper Tours
May 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?