By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 7.5 Million BAM for Infrastructure Projects in Mostar
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > 7.5 Million BAM for Infrastructure Projects in Mostar
OTHER NEWS

7.5 Million BAM for Infrastructure Projects in Mostar

Published June 11, 2016
Share
SHARE

worksEmir Nuspahić from the Department of Urbanization and Construction of the Office for Infrastructure Issues of the City of Mostar revealed information about the most important infrastructure projects in the field of roads in the City of Mostar.

In addition to the continuation of construction of collectors which are being built in the body of city roads (Boulevard and Maršala Tita Street), including reconstruction of those roads, also foreseen is the reconstruction of the Kralja Tvrtka Street, with the construction of two roundabouts in the same street. Reconstruction also covers the underground installations and estimated value of those works is 500.000 BAM.

Also reconstructed will be the Maršala Tita Street on the section along the Sjeverni logor, as well as number of roads in Sjeverni logor. Those works include only the upper layer of the road and the replacement of sidewalks, and their total estimated value is 400.000 BAM.

The value of the entire reconstruction of water and sewerage infrastructure and paving of Fejićeva Street, with the belonging fittings, amounts to three million BAM.

Construction of the road from the new bridge on the extension of the Avenue to the Maršala Tita Street includes the construction of a pedestrian underpass, drainage, pedestrian trails and public lighting, and their estimated value is 3.5 million BAM. Construction of a roundabout near the facility “Mljekara” includes the reconstruction of underground installations.

Reconstruction of a section of the local road L13 in Podveležje includes reconstruction of the upper layer of the road, with necessary extensions with the aim of enabling the transportation of equipment for the wind power plant, Nuspahić stated.

(Source: akta.ba/photo: abcmagazin.info)

Congratulations on the Occasion of the Eid al-Adha from Sarajevo Times

BiH has lost Forty Billion Dollars of GDP during the 1992-1995 War

Interesting Story about a US High School Student who will spend a Year in BiH

Who negotiated the Return of Car that was stolen before the Murder of the Sarajevo Policemen?

February: Average monthly paid off earnings 838 BAM

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Why is the Proposal by the European Commission inacceptable for the RS?
Next Article Frozen Raspberries in the first IQF Tunnel in BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BHRT’s Account may be blocked at the End of the Month
February 10, 2026
Soreca: EU Membership remains the best Guarantee for long-term Prosperity
February 10, 2026
Dodik: Muslim Sarajevo Is the Enemy; State Judiciary to Be Abolished and the Republika Srpska Army Restored
February 10, 2026
Niksic on Dodik’s Outbursts: We Are Witnessing Hate Speech and an Astonishing Concentration of Lies and Insults
February 10, 2026
Analysis: the most in-demand Occupations in 2026 in BiH
February 10, 2026
Who is Sinisa Karan, the newly elected President of RS?
February 10, 2026
Helez called on Dodik to “finally” initiate the Secession of RS: Do what you have been threatening for Years, we are ready
February 10, 2026
Eurowings brings forward and grows new Sarajevo Service
February 10, 2026
Waste Removal Continues at Jablanica HPP Dam After Temporary Suspension
February 10, 2026
Experts warn that Trump’s Policy threatens the World Order
February 10, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?