By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: A NATO Base and a Marina worth 2 billion Euros are springing up on the Adriatic
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > WORLD NEWS > A NATO Base and a Marina worth 2 billion Euros are springing up on the Adriatic
WORLD NEWS

A NATO Base and a Marina worth 2 billion Euros are springing up on the Adriatic

Published: January 16, 2024
Share
SHARE

The management of the port of Durres in the north of Albania has announced that it will open a tender for the construction of a new cargo terminal in its largest port during the first quarter of 2024.

Namely, the first phase of the project received a construction permit after the successful completion of the executive design of the new facility, the Port of Durres Authority announced on Tuesday.

The detailed project was prepared by a consortium consisting of the Dutch engineering firm Royal Haskoning DHV and the Albanian consulting firm Abkons, the Government of Albania announced earlier.

In the first 3 months of 2024, an international tender for the construction of the new port of Porto Romano will be opened. With the completion of the implementation project and the obtaining of the development permit for the 1st phase of construction, a panel consultation will be held with NATO representatives regarding the construction of the naval base, which is an integral part of this strategic project.

The new port will be built in the Porto Romano area in the northwestern part of Durres. The existing port in the southern part of the city will be transformed into a new tourist-residential project with a marina worth 2 billion euros, and the main investor is the company Emaar, based in the United Arab Emirates.

The term for the completion of construction is 5 years. It is also planned to connect the port of Porto Romano by rail with the intermodal terminal in Pristina and the intermodal terminal in Struga in North Macedonia.

This was confirmed by the Minister of Infrastructure and Energy of Albania, Belinda Balluku, who stated that along with the expansion of the port capacity in Durres, the expansion of the existing Tirana – Durres highway (SH2) is being prepared by building a stop lane with minimal land expropriation costs, the construction of a bypass around Tirana, which would upgrade it to the highway standard, and with a new railway to Pristina.

Mostar to be connected with Rome, Munich, Bari and Verona?
New EU Entry Control System Starts October 12, Border Congestion Expected With BiH
A Monument Dedicated To The Victims Of The Genocide In Srebrenica Was Built In Vienna
The Dollar approaches a Two-Year High
Italian Embassy Brings Sicilian Flavours to BiH for 11th Week of Italian Cuisine
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love1
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Brave Swimmers swam in the Icy Lake at an Altitude of 1.700 Meters
Next Article AS Roma has terminated Cooperation with Portuguese Expert Jose Mourinho
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

One of the best female Athletes in History, Jackie Joyner-Kersee, arrives in Sarajevo
September 17, 2026
Von der Leyen “Appalled” by Mladic’s Funeral, but Postpones Announcements of Measures against Serbia
September 17, 2026
Former Kosovo President Hashim Thaci sentenced to 25 Years for War Crimes
September 16, 2026
BHRT Journalists Sue the State Over Working Conditions and Rights
September 16, 2026
Nationalist Performance on the BiH – Serbia Border: ‘Youth’ Join the Serbian and Republika Srpska Flags
September 16, 2026
What is the average Monthly paid Net Salary in the Federation of BiH?
September 16, 2026
Deputy FM participates in IAEA Regular Session
September 16, 2026
Picula: “Illusions about European Serbia Must Be Buried with Mladić, Is There a Need to Continue?”
September 16, 2026
UEFA Introduces New Rule: Changes Arrive in Bosnia and Herzegovina
September 16, 2026
Indictment against the Federal Minister of Development and Entrepreneurship confirmed
September 16, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?