By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: BiH got new 7.2 Kilometers of Highway: Buna-Pocitelj Subsection completed
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > BiH got new 7.2 Kilometers of Highway: Buna-Pocitelj Subsection completed
BUSINESS

BiH got new 7.2 Kilometers of Highway: Buna-Pocitelj Subsection completed

Published: May 18, 2021
Share
SHARE

The asphalted works on the subsection Buna-Pocitelj have been finished, which means that Bosnia and Herzegovina (BiH) got a new 7.2 kilometers of highway on Corridor 5C, as was confirmed from the Public Utility (P.U.) Autoceste of Federation of BiH (FBiH).

Boze Talic, the representative of the investors, told that the asphalt works were completed on Wednesday, after which there were small jobs related to the installation of equipment, but this section of the highway was successfully finished.

“The asphalted works have been completely completed, but of course there will be no official opening now because the section cannot be used until the subsection Pocitelj-Zvirovici is completed,” said Talic. He emphasized that the new 7.2 kilometers of highway will be secured and protected by then.

This subsection is positioned between the subsection tunnel Kvanj-Buna on the north and subsection Pocitelj-Zvirovici on the south side.

The route starts about four kilometers south of the village of Hodbine and does not cross more densely populated areas, but passes over the Neretva canyon near several populated places and ends directly in front of the Pocitelj loop.

Since it was passing by the settlements of Stanojevici and Kevcici, the route cut off the road communication, which is why the Grabovina and Kevcici overpasses were built, while an underpass of the same name was built on the part of the route near Bivolje Brdo. Of the other facilities on this route, there are two passages for animals, as well as a two-sided rest area Rotimski potok.

The contract that Hering signed in May 2018 with P.U. Autoceste FBiH is worth 25.7 million euros. The funds were provided through the European Bank for Reconstruction and Development, and the construction was supervised by Aecom S.L.U. from Spain.

Even though this subsection has been completed, 7.2 kilometers of highway will be operational after the construction of the colossal bridge Pocitelj, where works, as well as on the entire subsection Pocitelj-Zvirovici, 11.75 kilometers long, are in full swing and should be completed by the end of next year.

With the construction of these sections, BiH will get a new 18 kilometers of highway on Corridor 5C, which will be linked to the European road network, Klix.ba writes.

E.Dz

Prosecutor’s Office proposed Detention for Minister of Human Rights of BiH
Project to modernize the Facilities and Crane at the Brcko Port officially launched
Dita Tuzla operates positively and goes on sale in early 2017?
TIBiH requests Inspection of the Contract on the Construction of the Banjaluka – Prijedor Highway
Young People from Donji Vakuf revived the Hadžija’s Mill
TAGGED:#bosnia#highway#kilometers
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Minister Brnabic in Sarajevo: Serbia allocates around 500 million Euros for projects in Republika Srpska
Next Article Measure of Custody to be ordered for Person suspected of Funding Terrorist Activities
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Orlic: Search on Elbrus suspended due to Stormy Winds
July 27, 2026
Becirovic sent his Condolences on the over the Tragedy on Elbrus Mountain
July 27, 2026
Bosnia’s Ruling Coalition Nears End of Mandate with Few Promises Delivered
July 27, 2026
BiH Exhausts Annual Foreign Worker Quota as Businesses Call for Labor Market Reform
July 27, 2026
Association of Independent Intellectuals Problematizes Design of Ballots for the Presidency of Bosnia and Herzegovina
July 27, 2026
Letter by the London Mayor: “Being in Srebrenica is a deeply moving Experience I will carry with me for the rest of my life”
July 27, 2026
Solomun Wraps Up the Sarajevo Film Festival Once Again: “Sarajevo, I Missed You”
July 27, 2026
Russian Embassy: We are deeply shaken by the Tragedy of Mountaineers from BiH
July 27, 2026
Krnic and Kazic Crowned Champions at 460th Traditional Old Bridge Diving Competition in Mostar
July 26, 2026
BiH introduces New Ballots without Candidate Names for 2026 General Elections
July 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?