By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Chinese Companies will begin the Renovation of Block 6 of the Tuzla Thermal Power Plant
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Chinese Companies will begin the Renovation of Block 6 of the Tuzla Thermal Power Plant
BUSINESS

Chinese Companies will begin the Renovation of Block 6 of the Tuzla Thermal Power Plant

Published: February 15, 2023
Share
SHARE

“Coal business in Europe has long ceased to be relevant, there are fewer and fewer companies, equipment manufacturers, service companies, so unfortunately it seems that these jobs are still done only by the Chinese.”

This is how the director of Elektroprivreda Bosnia and Herzegovina (EP BiH) Admir Andelija explains why the consortium of two Chinese and one BiH company got the job of renovating the boiler of Block 6 of the Tuzla Thermal Power Plant.

Two Chinese companies, “Dongfang Electric International Corporation” and “Dongfang Boiler Group”, will work with the company ITC from Zenica, in central BiH. The value of the project is 25.44 million BAM (about 13.02 million euros), which will be financed by EP BiH from its own funds.

This consortium had the most favorable offer in the tender, and at the beginning of March, Andelija says, they will start work on the revitalization of the boiler.

Block 6 is the second job at Tuzla Thermal Power Plant that was entrusted to the Chinese, after Block 7, worth almost 700 million euros, the construction of which has not yet started, although it has been current since 2014.

What kind of companies are these?

“Dongfang Electric” is a Chinese state-owned company that produces equipment for power plants and projects in the field of energy.

They built Stanari Thermal Power Plant(in the north of BiH), which has been operating since 2016, the only private thermal power plant in BiH, as well as the only one that was built by Chinese contractors, and is fully completed.

“Dongfang Boiler Group” is a company that functions as part of “Dongfang Electric”, and produces boilers for thermal power plants, safety valves, and engines for steam turbines, Radio Slobodna Evropa reports.

E.Dz.

Foreign Trade Exchange of BiH increased by 2.12 Billion BAM
Another 180 million Euros agreed for sections of Corridor Vc
Positive Business Story: Poljoprom Company bought by Hifa Group
Tulips Production in Sarajevo Soon
Svilaj Bridge Between Croatia and Bosnia and Herzegovina completed
TAGGED:#bosnia#news#tuzla
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Another USAR Team from BiH arrived in Turkey
Next Article Is Bankruptcy being prepared in the Mines in BiH?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

New Steelwork Zenica is threatened with Bankruptcy and Layoffs for 1,890 Workers
May 28, 2026
New Price Increases in Bosnia and Herzegovina
May 28, 2026
Former HR Call to Abolish the OHR – BiH Needs a Fresh Start
May 28, 2026
Court of BiH acquitts Durakovic of War Crimes in the area of Cajnice
May 28, 2026
Two Visits in One Month: Dodik and Republika Srpska Delegation Return to Moscow
May 28, 2026
Prosecutor’s Office suggests Prusac’s Detention to be extended for another Two Months
May 28, 2026
EBRD supports digital and green transformation of SMEs in BiH
May 28, 2026
The Ministry of Interior of the Sarajevo Canton is hiring 220 Police Officers
May 28, 2026
The White House denies the Report on the Memorandum with Iran
May 28, 2026
Who Will Be the New High Representative?
May 28, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?