By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Contracts for the Construction of the Thermal Power Plant in Banovici signed
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Contracts for the Construction of the Thermal Power Plant in Banovici signed
BUSINESS

Contracts for the Construction of the Thermal Power Plant in Banovici signed

Published: November 25, 2015
Share
SHARE

contractMunever Cergic, Director General of the Brown Coal Mine Banovici (RMU) today signed contracts for implementation of the project of the Thermal Power Plant construction in Banovici with partners from China.

On behalf of the RMU Banovici, Cergic signed the contract for strategic cooperation with Dongfang Electric Corporation Limited (DEC). Besides this contract, following contracts were signed as well: the Contract of engineering, procurement and construction (EPC Contract) on a “turnkey” system for the power plant Banovici, block 1-350 MW between RMU Banovici “and Dongfang Electric Corporation Limited (DEC), as well as the framework contract for the funding of the Thermal Power Plant Banovici, block 1-350 MW between RMU “Banovici and Industrial and Commercial Bank of China (ICBC).

“Framework agreement that was signed today means that the construction of thermal power units, which will meet the highest European standards, can be started as early as next year. These are the latest technology and, in fact, this way the foundations of energy sector of B&H for the future are made. This will also resolve economic problems and the problem of pollution of cities Banovici and Zivinice, while the problem of heating of these two cities could be solved as well. It would be realistic to start with the construction of the Thermal Block in the following year,” according to the source.

(Source: novovrijeme.ba)

Kazazovic: Electronic Classrooms in All Schools by September
Branding Conference Began in Sarajevo
Fair “Energa 2014” Completed by Presentation of Awards
Conclusions on the Meeting of Representatives of the Government of the CS and Investors from South Korea
Hrvić: Why would not B&H produce 80% of Food and import 20%?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BURCH University Students visit the Children of the Pediatric Clinic
Next Article B&H Reality: Holiday Atmosphere in Sarajevo, working day in Banja Luka (gallery)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Sarajevo Canton Invests Millions of BAM in the Renovation and Equipment of the Emergency Medical Services
May 18, 2026
Belgrade-Sarajevo Highway: Serbia is building, BiH is stalling in Political Disputes
May 18, 2026
BiH FM at the Meeting of the International Coalition to End Violence against Women and Girls
May 18, 2026
Deputy Chairperson of BiH CoM to pay an Official Visit to Azerbaijan
May 18, 2026
Bosko and Admira died together defending their Love 33 Years ago
May 18, 2026
Man from Kiseljak kills One Woman, severely injures Another
May 18, 2026
BiH Close to Returning to MONEYVAL Grey List
May 18, 2026
The Una River is a Symbol of Life and Natural Wealth
May 18, 2026
Discover the Forgotten Gates of Sarajevo: Secrets and the Influence of Austro-Hungarian Architecture
May 18, 2026
EUFOR Supported the 3rd International Coffee and Chocolate Fair in Tuzla
May 18, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?