By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Contracts for the Construction of the Thermal Power Plant in Banovici signed
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Contracts for the Construction of the Thermal Power Plant in Banovici signed
BUSINESS

Contracts for the Construction of the Thermal Power Plant in Banovici signed

Published: November 25, 2015
Share
SHARE

contractMunever Cergic, Director General of the Brown Coal Mine Banovici (RMU) today signed contracts for implementation of the project of the Thermal Power Plant construction in Banovici with partners from China.

On behalf of the RMU Banovici, Cergic signed the contract for strategic cooperation with Dongfang Electric Corporation Limited (DEC). Besides this contract, following contracts were signed as well: the Contract of engineering, procurement and construction (EPC Contract) on a “turnkey” system for the power plant Banovici, block 1-350 MW between RMU Banovici “and Dongfang Electric Corporation Limited (DEC), as well as the framework contract for the funding of the Thermal Power Plant Banovici, block 1-350 MW between RMU “Banovici and Industrial and Commercial Bank of China (ICBC).

“Framework agreement that was signed today means that the construction of thermal power units, which will meet the highest European standards, can be started as early as next year. These are the latest technology and, in fact, this way the foundations of energy sector of B&H for the future are made. This will also resolve economic problems and the problem of pollution of cities Banovici and Zivinice, while the problem of heating of these two cities could be solved as well. It would be realistic to start with the construction of the Thermal Block in the following year,” according to the source.

(Source: novovrijeme.ba)

Brcko District to invest 290 Million BAM in Infrastructure
After Price Increase: Meat is a Luxury for People in BiH
Revenues from Indirect Taxes amounted to 1 billion and 823 million BAM
Dodik: Hungary allocates another Five Million Euros for RS
Christmas Bazaar held in the Embassy of Germany in Sarajevo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BURCH University Students visit the Children of the Pediatric Clinic
Next Article B&H Reality: Holiday Atmosphere in Sarajevo, working day in Banja Luka (gallery)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Cvijanovic claims that the Constitutional Court of BiH does not have Jurisdiction over Becirovic’s Appeal
July 20, 2026
Airports in Bosnia and Herzegovina recorded almost 326,000 Passengers in June
July 20, 2026
New Dispute over the Highway: Dodik reopens the Brcko Issue
July 20, 2026
Feast of Saint Hedwig Celebrated in Trappists: A Polish Queen of Bosnian Roots
July 20, 2026
Beganovic shines on legendary Track: “It feels good”
July 20, 2026
During the Re-Exhumation Process, 1,220 Graves Were Opened in Srebrenica, Some More Than Once
July 20, 2026
Unknown Treasures from the Archive Shelves: BiH preserves priceless Cultural Heritage
July 20, 2026
Zejna Mehic from Vlasic celebrated her 100th Birthday
July 20, 2026
Craft Occupations are increasingly in Demand in BiH
July 20, 2026
Fewer Violations expected after the new Law?
July 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?