By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: EBRD Approved Credit of 35 Million Euros for Construction of Hydro Power Plant “Vranduk” and “Una-Kostela”
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > EBRD Approved Credit of 35 Million Euros for Construction of Hydro Power Plant “Vranduk” and “Una-Kostela”
BUSINESS

EBRD Approved Credit of 35 Million Euros for Construction of Hydro Power Plant “Vranduk” and “Una-Kostela”

Published March 19, 2013
Share
SHARE

A delegation of the public company Elektroprivreda BiH, led by General Director Elvedin Grabovica, has successfully completed negotiations with the European Bank for Reconstruction and Development (EBRD) in London on the financing of the construction of the hydro power plant “Vranduk” on river Bosna and expanding the capacity of the hydro power plant “Una-Kostela” on the river Una.

EBRD approved a loan of 35 million euros to Elektroprivreda BiH under very favorable conditions.

Of the approved amount for the construction of “Vranduk”, 26 million euros is planned, while for “Una-Kostela” 9 million euros is planned.

The resources allocated for the construction of the facilities will be operational after the completion of the prescribed procedures.

The press release from the Elektroprivreda BiH says that for the purpose of long-term supply of electrical energy, the FBiH reached a decision that established public interest for the construction of more power plants, among which is the construction of “Vranduk” the first priority.

The construction of “Vranduk” and “Una-Kostela” would contribute to the overall reduction in emissions of CO2 and other pollutants, improve the production of energy in the hydro and thermal plants of Elektroprivreda BiH, and it would also contribute to economic development of the FBiH.

Chairman Zvizdic with Peihua: To increase the Volume of Trade with China

KLAS is Expanding Export Markets: Halal Products Soon in Russia

What was the Percentage of Exports of Products from the RS to Russia?

Students of the Faculty of Electrical Engineering in Banja Luka made the first Integrated Chip

Wizz Air announces New Routes from Tuzla

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Film ‘Black Harvest’ in Meeting Point Cinema
Next Article Japanese film ‘Love letter’ in Meeting Point Cinema
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Fuel Prices lower from Tomorrow in Republika Srpska
April 14, 2026
Van der Bellen meets with the Leadership of the BiH Parliament
April 14, 2026
City in Bosnia and Herzegovina Offers Apartments for One BAM per Square Meter
April 14, 2026
Motorway Sections in the Federation of Bosnia and Herzegovina to Open in 2026
April 14, 2026
Canton Sarajevo Government adopts the Tourism and Air Traffic Development Incentive
April 14, 2026
Chairwoman of the CoM opens 27th International Economic Fair in Mostar
April 14, 2026
Becirovic: Austria’s Support Crucial as BiH Faces Attacks on Constitutional Order and Seeks Stronger Cooperation
April 14, 2026
EUFOR Commander Continues to Strengthen Engagement with Local Communities
April 14, 2026
Unemployment Map exposes deep Labor Market Gaps in BiH
April 14, 2026
Flyadeal plans new Sarajevo Service
April 14, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?