By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Energy Sector Strengthened B&H Industrial Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Energy Sector Strengthened B&H Industrial Production
BUSINESS

Energy Sector Strengthened B&H Industrial Production

Published: February 4, 2014
Share
SHARE

energetikaThe sector for the production of electricity provided encouraging business results during nine months in 2013 (January-September), in comparison to previous months and gave a positive contribution to the overall industrial production in B&H, showed the analysis from the Directorate of Economic Planning of B&H.

Thus, according to the latest available data of the Independent System Operator in B&H from January-September 2013, the total production of electricity amounted to 11.983 GWH, which is an increase by more than 30 percent compared to the same period last year.

Favorable weather conditions and the very good hydrological situation throughout the year resulted in a record growth in production in hydropower production, which was the key reason of the overall increase in the production of electricity in B&H.

Observing the structure of total electricity production in B&H during these nine months in 2013, hydropower plants participated with 48 percent, while thermal power plants participated with 52 percent. By comparison, in 2012 thermal power plants took part in the total production of electricity with 69 percent, and hydropower plants with 31 percent.

Thus, the total production of electricity in hydroelectric plants in nine months from last year doubled in comparison to the same period last year.

(Source: Fena)

Turkish Loan: “Poljorad” from Travnik as a Source of Income for 50 Employees and 1 200 Subcontractors
The FB&H Government to give 20 Million BAM to Coal Mining Industry
Multi-million Swiss Investment in Zvornik to bring New Workplaces for 40 People
Top 5 Business News and Events of the past Week
Mercator plans to get Sales Revenue of 2.4 Billion Euros in 2018
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Adi Nalić in AC Milan
Next Article B&H Returned to FIDE List
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

The new UK Ambassador arrived in Sarajevo: “A View that I will enjoy for Years to come”
August 28, 2026
Arrest of Ratko Mladic: When Police Entered the House He Was Hiding Behind the Door
August 28, 2026
BiH Minister of Foreign Trade: “Mladic Was, Is, and Will Remain, My Commander”
August 28, 2026
Sarajevo marks 31st Anniversary of Markale Massacre and pays Tribute to those tragically killed
August 28, 2026
BiH UK Network: Mladic’s Death must not overshadow the Memory of His Victims
August 28, 2026
Ten Suspects handed over to the CS Prosecutor’s Office after the “Catering” Operation
August 28, 2026
Genocide Victims Association: Mladic’s Legacy is Mass Graves
August 28, 2026
BiH Basketball to welcome the Italian National Team Tonight
August 28, 2026
Sunny and hot in BiH, Temperatures up to 40 Degrees Celsius
August 28, 2026
Norwegian King Harald V passed away
August 28, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?