By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Energy Sector Strengthened B&H Industrial Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Energy Sector Strengthened B&H Industrial Production
BUSINESS

Energy Sector Strengthened B&H Industrial Production

Published: February 4, 2014
Share
SHARE

energetikaThe sector for the production of electricity provided encouraging business results during nine months in 2013 (January-September), in comparison to previous months and gave a positive contribution to the overall industrial production in B&H, showed the analysis from the Directorate of Economic Planning of B&H.

Thus, according to the latest available data of the Independent System Operator in B&H from January-September 2013, the total production of electricity amounted to 11.983 GWH, which is an increase by more than 30 percent compared to the same period last year.

Favorable weather conditions and the very good hydrological situation throughout the year resulted in a record growth in production in hydropower production, which was the key reason of the overall increase in the production of electricity in B&H.

Observing the structure of total electricity production in B&H during these nine months in 2013, hydropower plants participated with 48 percent, while thermal power plants participated with 52 percent. By comparison, in 2012 thermal power plants took part in the total production of electricity with 69 percent, and hydropower plants with 31 percent.

Thus, the total production of electricity in hydroelectric plants in nine months from last year doubled in comparison to the same period last year.

(Source: Fena)

The Implementation of new Economic Projects from Saudi Arabia announced
How much will the construction of new hot water Pipeline cost?
BiH to ban the Export of Forestry Assortments?
Do you know how much Money remains in B&H when you buy a Domestic Product worth 10 BAM?
Young Farmers received 7.7 Million BAM from the Federation of BiH
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Adi Nalić in AC Milan
Next Article B&H Returned to FIDE List
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Habota: Citizens are interested in the concrete Effects of European Integration on their daily Lives
June 14, 2026
The Fifth Edition of the largest Humanitarian Run Stojcevac 5K successfully held
June 14, 2026
33 years since Crimes committed against Bosniak Civilians in Tulica
June 14, 2026
Average Salary Covers Less Than Half of Consumer Basket
June 14, 2026
83rd Anniversary of the Battle of Sutjeska marked
June 14, 2026
Sarajevo Marathon Association Confirms Rescheduling of Popular Night Race
June 14, 2026
Education for the 21st Century from Serbia named winner of the 2026 Max van der Stoel Award
June 14, 2026
Party Leaders arrive at the Meeting of the Opposition
June 14, 2026
UDIK: Bikavac is One of the most Cruel Crimes committed against Bosniaks
June 14, 2026
Esmir Bajraktarevic is the Second fastest Player at the World Championship so far
June 14, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?