By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Opening of a new Section of Sarajevo Bypass to take place today?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The Opening of a new Section of Sarajevo Bypass to take place today?
OTHER NEWS

The Opening of a new Section of Sarajevo Bypass to take place today?

Published November 22, 2017
Share
SHARE

Section of LOT 2C on Sarajevo Bypass, Brijesce – Safeta Zajke Street, will be officially opened at Brijesce viaduct today.

This event will be attended by Prime Minister of FBiH Fadil Novalic, federal ministers and representatives of cantonal and municipal authorities, investors, contractors and everyone else engaged in this project.

The main task of the Sarajevo Bypass is to increase the level of service for transit traffic and the quality connection between the city and the local traffic on the highway A1 at the Corridor 5-C.

The newly constructed section (LOT-2C) has the elements of a fast road, which provides a higher level of service, more quality ride comfort and shortened time of travel.

The section of Sarajevo Bypass (LOT-2C) is consisted of a part of section in the length of about 800 meters, the object “Pergola” in the length of 120 meters over which the Sarajevo Bypass crosses the railway line, after which it is connected to the Safeta Zajke Street in a total length of 450 meters.

The value of the works for LOT-2C amounted to 9.574.554, 09 BAM (with VAT) and the funds were secured through the loan provided by international financial institutions (EBRD, EIB and OPEC Fund).

(Source: Radiosarajevo.ba)

The new Russian Gas Pipeline for BiH stopped at the Drina River

Major General Alexander Platzer conducts inspection of Defence Industry Facility in BiH

The 45th International Fair of Plum opened in Gradacac

Significant Increase in New Coronavirus Cases and Deaths in BiH

Humorous Status of one Bosnian: Why B&H should be called the United States of Bosnia?

TAGGED:#BiH#corridor5C#infrastructure#opening#roadSarajevo Bypasssection
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Healthy organic Food to be produced at the Plantation in the Forest Park Mojmilo
Next Article Ramiz is looking for Bones of the Victims in Forests around Srebrenica for a Decade
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Romanian Football Icon Mircea Lucescu Dies at 80
April 8, 2026
Trump: “Direct Talks with Tehran coming soon”
April 8, 2026
What Did Donald Trump Jr. Talk About in Banja Luka?
April 8, 2026
IATA: It will take Several Months for Kerosene Supplies to return to Normal
April 8, 2026
After SDS Party Warning, the Government paid off the Debt to the Health Centers
April 8, 2026
More than One Million BAM for safe Houses in the Federation of BiH
April 8, 2026
KCUS paves the Way for Robotic Surgery in BiH
April 8, 2026
Ginkel and Izetbegovic discuss the Southern Interconnection and Economic Cooperation
April 8, 2026
EUFOR Deputy Commander Visits Tuzla
April 8, 2026
Lakic and Volz: Southern Interconnection Key to Security and new Investments in BiH
April 8, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?