By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Pocitelj Bridge has been repaired, the opening Date is not yet known
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Pocitelj Bridge has been repaired, the opening Date is not yet known
BUSINESS

The Pocitelj Bridge has been repaired, the opening Date is not yet known

Published: April 22, 2024
Share
SHARE

The Pocitelj Bridge has been repaired, but the exact date of reopening to traffic is still unknown. According to the Public Company Motorways of the Federation of Bosnia and Herzegovina (FBiH), the longest bridge of the Vc corridor should be opened by the beginning of the summer season.

Motorways of FBiH remind that during the execution of works on prestressing, damage (appearance of cracks) occurred on the lower plate of segment 15, between the pillars S3 and S4 of the Pocitelj bridge.

In technical terms, according to performed analyses, it was shown that minor changes in the geometry of the cables can lead to significant increases in tensile stress in the concrete. Irregularities in the positioning of cable pipes during construction created radial torsional forces that could lead to problems or the appearance of cracks of a local nature.

After the work to eliminate deficiencies, the bridge was restored to its designed condition, meaning it has the same load-bearing capacity, usability, and durability as envisaged by the main project, Motorways of FBiH added.

The plan is to open the Pocitelj – Zvirovici section, which includes the aforementioned Pocitelj bridge, to traffic by the beginning of the summer season, after which BiH will gain an additional 11 kilometers of motorway on the Vc corridor.

Regarding the continuation of the construction of the Vc corridor in its southern part, the plan is for construction works to start by the end of this year on the Mostar South – Kvanj Tunnel and Kvanj Tunnel – Buna sections.

In addition to these sections, construction works will also commence this year on the Mostar North – Mostar South section in Herzegovina, as well as the construction of the most complex structure on the entire corridor, the Prenj Tunnel.

The start of works on these sections will bring about 40 km of active construction sites, Motorways of FBiH announced.

E.Dz.

BH Company produces 1,100 Pairs of Shoes per Day
Unemployment Rate decreased in February
Qatar Market Great Chance for BIH Constructors
BiH Ammunition and Weapons Factory to increase its Capital
Superbrands Ceremony: Nineteen Brands Awarded
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article A Man from a Village in BiH befriended a Bear
Next Article Vucic at the UN: Pristina creates unbearable conditions for the life of Serbs
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Acting High Representative Crishock meets Delegation from US Congress
September 5, 2026
Kos: “Public Support for Mladic is not compatible with Serbia’s Request to join the EU”
September 5, 2026
What Voters need to know about the 2026 General Elections
September 5, 2026
Bugojno marks the 837th Anniversary of the Charter of Ban Kulin
September 5, 2026
Member of BiH Presidency Welcomes the Special Envoy to the Western Balkans, Karen Pierce
September 5, 2026
Son of a War Criminal, Ratko Mladic, Claims: My Father Was Murdered
September 5, 2026
Fifteen-year-old Girl handed over to the Prosecutor’s Office after Attack in front of School
September 5, 2026
Over 300 Participants at the 4th Sarajevo Security Conference on Europe in a Divided World
September 5, 2026
BHANSA prepares an operational Plan in Response to the Growth of Drone Traffic
September 5, 2026
Vucic says He will not attend the Funeral of Convicted War Criminal Ratko Mladic
September 5, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?