By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 30 Million BAM Project: Hydro power Plant Kakanj to be built soon
BUSINESS

30 Million BAM Project: Hydro power Plant Kakanj to be built soon

Published August 23, 2017
Share
SHARE

Elektroprivreda BiH has issued a public call for the development of investment-technical documentation for the Hydropower Plant Kakanj.

The deadline for receiving bids is September 21st this year and the estimated total value of contract without VAT is 350 000 BAM.

Hydropower plant Kakanj has an installed capacity of 4.69 MW with a planned annual production of 22.58 GWh. Power plant Kakanj will be located at the location of the River Bosna, in the area of Kakanj municipality.

The total value of the investment is 30,5 million BAM and, as planned, it will be financed by credit and funds of JP EPBiH.

(Source: akta)

Becirovic – Fitschen: Important to continue Cooperation between BiH and Germany

Young People from BiH spoke about Art with prominent Theatre Directors

Conference Tomorrow on Improving Economic Cooperation Between BiH and Russia

‘Days of Strawberry Fruit’ to be held in BiH’s City of Celic

The Second Town in the FB&H by the Increase of Employment Rate – Olovo

TAGGED:#BiH#Kakanj#powerPlant#productionBUSINESS
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article David Siljeg broke Record in Length of Flight with Paraglider (video)
Next Article Minister Mektic: No Information that Women are being paid to cover themselves
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Strengthening Security Cooperation: EUFOR Commander Meets BiH Deputy Defence Ministers
March 10, 2026
Hegseth: US is ‘winning’ the War against Iran
March 10, 2026
Commander of NATO Headquarters Sarajevo visits Banja Luka
March 10, 2026
Analysis: The Last Year of Operations at the Railways of the Federation of BiH
March 10, 2026
Sarajevo Lawyer Vasvija Vidovic sentenced to Prison
March 10, 2026
FPA searched the Premises of the FBiH Ministry of Finance
March 10, 2026
Halilhodzic’s spectacular Return: Legendary Vaha takes on French Giant
March 10, 2026
The War in the Middle East will greatly affect Tourism in BiH
March 10, 2026
BiH’s Foreign Exchange Reserves increased to 18.15 Billion BAM
March 10, 2026
Over 39,000 Human Trafficking Cases Recorded in Europe Over the Past 20 Years
March 10, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?