By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Chinese to build a Billion BAM worth Power Plant in Sanski Most?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Chinese to build a Billion BAM worth Power Plant in Sanski Most?
BUSINESS

Chinese to build a Billion BAM worth Power Plant in Sanski Most?

Published: December 10, 2017
Share
SHARE

The realization of one of the largest post-war projects in BiH – the mine and thermal power plant Kamengrad (RiTE) in Sanski Most, which is worth more than a billion BAM, was announced a few days ago in Budapest.

The signing of contracts with Chinese investors is expected in the middle of the next year, and after that will follow concrete activities on the project.

From the FIPA was announced that the Memorandum of Cooperation on Realization of the Project of Mine and Thermal Power Plant Kamengrad was signed between companies Lager Ltd. and China Energy Group and as it is not available for third parties.

“It defines further obligations of both sides and the deadlines for their execution. The Memorandum on Cooperation represents the result of a series of meetings and arrangements and prefeasibility study,” as noted from FIPA.

When we observe the economic sense, the project of Kamengrad is historical, considering the fact that the value of the project is above 1.000.000.000 BAM, and taking into account its importance for the development of the municipality, canton, as well as the whole country. It also represents one of the largest investments in BiH.

The investor China Energy Group is the largest Chinese group that is realizing projects from the energy sector around the world. The American Journal of Engineering New-Record (ENR) published a list of 250 leading international entrepreneurs, according to which China Energy Group is placed as 11th on the list, while it occupies 4th position in the Top 150 Global Design Firms.

The Mayor of Sanski Most Faris Hasanbegovic recently stated that the city authorities are supporting this project, but that it needs to be complied with all legally prescribed legislation, especially from the sector of ecology and health protection.

The Government of the FBiH  issued a decision in 2016 with which the construction of a thermal power plant in Sanski Most is considered as a strategic project in BH energy sector. As noted, with a capital investment of 1.020.000.000 BAM, it will be one of the largest investments in BiH.

(Source: M. C./Klix.ba)

 

 

 

 

 

Malaysian “Khazanah Nasional” Will Participate in “Sarajevo Business Forum 2013”
Transporters Demand To Be Allowed Refund Of Excise Duties On Diesel
Dodik: A very strong, perhaps even unexpected Answer follows
Shopping Mall Sarajevo City Center Opens on 13 March
Domestic Shopping Mall “Bingo“ officially opened in Gorazde
TAGGED:#BiH#investment#mine#projectChinese companyRiTE KamengradSanski Mostthermal power plant
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Can the Expulsion of Diesel Vehicles from European Roads be a good News for BiH?
Next Article Do you know the Story about Fatima Music, the First Woman Pilot in BiH?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Interrupted Session of the House of Peoples of Parliamentary Assembly of BiH
June 4, 2026
Four People killed in Small Plane Crash in Croatia
June 4, 2026
Deputy COM EUFOR Highlights Importance of Joint Training and Interoperability
June 4, 2026
The Ministry of Economy of CS allocates more than 1.2 Million BAM for Women’s Entrepreneurship
June 4, 2026
“Mom, I Am Left All Alone”: Dino Beslic Breaks Hearts With Final Photo of His Parents
June 4, 2026
From Childhood Hobby to Football Time Capsule: Damir Bakrac’s 30-Year Panini Passion
June 4, 2026
Italy, the USA and France do not agree on the Election of a new HR in BiH
June 4, 2026
Yugo is coming back: Here’s what the new Model will look like
June 4, 2026
Two Members of BiH Presidency Hold Discussion in Front of Antonio Costa
June 4, 2026
What’s on BiH’s Eid Table? TasteAtlas Highlights the Country’s Most Beloved Festive Dishes
June 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?