By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Corridor 5C: Tunnel Igman 330 Meter Long Pierced
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Corridor 5C: Tunnel Igman 330 Meter Long Pierced
BUSINESS

Corridor 5C: Tunnel Igman 330 Meter Long Pierced

Published: May 28, 2014
Share
SHARE

PROBIJEN TUNEL IGMAN NA PODDIONICI VLAKOVO-LEPENICA NA KORIDORU 5-CIn addition to tunnel Gaja, another tunnel is pierced at the subsection Vlakovo-Lepenica, Corridor 5C. Tunnel Igman is 330 m long. Tunnel is pierced in four months despite all the challenges that workers faced.

“Work on the excavation of the tunnel Igman took place every day, 24 hours a day in three shifts. Dozens of workers were engaged in piercing the tunnel and many construction machines”, said Ensad Karić, Director of FB&H Autoceste.

According to FB&H Autoceste, the tunnel was dug by using the so-called Austrian methods, the most modern method in tunneling.

The subsection Vlakovo-Lepenica is 10 kilometers long. Works on this subsection were conducted by the Turkish company Cengiz Insaat, in partnership with many local construction companies (Euroasfalt d.o.o. Sarajevo, Hering d.d. Široki Brijeg, Deling d.o.o. Tuzla, A3 d.o.o. Široki Brijeg, Butmir d.o.o. Sarajevo i HP Investing d.o.o. Mostar). 350 million BAM is the contract value, of which 200 million BAM will belong to local companies.

This subsection is part of the section Vlakovo-Tarčin 20 kilometers long. So far, in this section apart from tunnel Igman are pierced tunnel Vis and tunnel Gaj.

The completion of the entire section Vlakovo – Tarčin will be done by the end of this summer, which connect Zenica with Tarčin by highway.
(Source: klix.ba)

Citizens of BiH will be able to see Elon Musk’s Satellites Tonight
Vučić: Motorway will connect the RS with Sarajevo 
BH Carriers suspended the Protests
Newly established Tax Design Company starts with Production
Inflation continued its downward Trend in BiH, the IMF says
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article B&H Football Players Arrived in St.Louis
Next Article Session of FBiH Government in Mostar
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Government of Japan grants new Ambulance Vehicles to the Health Care Centre in Kiseljak
November 5, 2026
Incredible Record-Holder from BiH: Muhammed Kahrimanovic Breaks 68 Baseball Bats with His Bare Hands in 60 Seconds
November 5, 2026
BiH Foreign Minister meets with the Ambassador of the United Kingdom to BiH
November 5, 2026
How long will it take for the Formation of a new Government in BiH?
November 5, 2026
Suka and Gasevic sentenced in a Non-Final Verdict for War Crimes near Sokolac
November 5, 2026
Protest by Healthcare Workers in front of the Cantonal Government Building
November 5, 2026
Pensions for October to be paid Today
November 5, 2026
Kos: BiH Is Drifting Further Away from the European Path
November 5, 2026
Japanese Film Festival to bring Japanese Cinema to Five Cities across BiH
November 4, 2026
Federal Police Administration conducts Searches of the Residential Properties
November 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?