By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Doboj: Setting up 2.100 m long protective Barrier against Flooding
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Doboj: Setting up 2.100 m long protective Barrier against Flooding
OTHER NEWS

Doboj: Setting up 2.100 m long protective Barrier against Flooding

Published: October 7, 2015
Share
SHARE

Protective Barrier Against Flooding Doboj klix.baThe construction of a protective barrier against flooding in the length of around 2.100 meters has started in Doboj, whose setting up will cost up to 800.000 BAM.

It is a protective barrier from the mouth of Usora River, downstream to the so-called depot located in the immediate vicinity of the traffic lights.

The Officer of the City Administration Rade Djurdjevic said that the means were provided by the UNDP and the City of Doboj.

Djurdjevic stated that the protective barrier is being constructed of one meter high concrete blocks, in order to reach the height which is 30 centimeters above the flooding point of the Bosna River during last year’s floods. According to him, the embankment is being constructed in two stages.

“The first stage includes the section from the old Railway Bridge downstream in the length of around 1.400 m, and it will cost 430.000 BAM. The second stage in the amount of around 350.000 BAM includes the section from the Railway Bridge upstream to the mouth of Usora River in the length of around 700 m”, Djurdjevic said.

Djurdjevic stated that the protective barrier is being constructed at the critical points of flooding, until the provision of 20.000.000 BAM for the implementation of the project of regulation of the basic riverbed of Bosna River in the length of five kilometers, due to protecting the city and the settlements on both banks of the river from floods.

The costs of project elaboration were provided by the Government of Republika Srpska, through the Solidarity Fund for Reconstruction.

(Source: klix.ba)

The First Cafe employing Persons with Down Syndrome work has opened in BiH
Restoration of Vijećnica in Final Phase
Support of UNDP BiH in Development of Free Legal Aid System
Czech Republic gave a donation to ”Drin”
New Radars in Croatia will recognize BiH Registration Plates?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Johnatan Moore: Relations between B&H and Serbia Excellent!
Next Article Mektic: B&H has a Response to the possible Refugee Crisis
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BiH Footballer Kerim Alajbegovic says Goodbye to Austrian Red Bull Salzburg
May 16, 2026
Podgorica and Belgrade exchange messages after Vucic’s Statement on Montenegro’s Independence Day
May 16, 2026
Budimir: We have the most prepared Police Agency in BiH
May 16, 2026
Construction of the New Mostar Airport Terminal Worth 1.5 Million Begins
May 16, 2026
He Was a Yugoslav Sports Legend, Now Facing Hard Times: “I Collect Bottles, I Am Not Ashamed”
May 16, 2026
New Adrenalin Attraction Overlooking the Neretva: Via Ferrata “Prenjska Vrata” for the Brave and Adventurous
May 16, 2026
A Major Turnaround in Pretis: Instead of Huge Profit – a Multi-Million Loss
May 16, 2026
Motorway Sections in the Federation of Bosnia and Herzegovina to Open in 2026
May 16, 2026
Modest Economic Recovery: Can Bosnia and Herzegovina Sustain a Positive Trend?
May 16, 2026
“The CHALLENGE” Exhibition on Italian Sports Design Opens at the Olympic Museum Sarajevo
May 16, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?