By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: How much will cost the Construction of the First Transversal?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > How much will cost the Construction of the First Transversal?
BUSINESS

How much will cost the Construction of the First Transversal?

Published June 11, 2016
Share
SHARE

transversalBased on a detailed analysis of the Construction Institute of the Sarajevo Canton, it was determined that part of the First transversal at section from Kranjceviceva Street to Hotonj, with the total length of 5.08 kilometers, will cost more than 215 million BAM.

Cost estimations were done separately for each subsection, and they refer to the approximate cost of construction works and resolving of the property and legal issues. Thus, the costs of preparing the construction land will amount to 51 million BAM.

On the section from Kranjceviceva Street to Velesici will be needed over 22 million BAM for resolving of the property and legal issues, from Velesici to Bar 14.6 million BAM, from Bar to the tunnel Kobilja Glava 825,000 BAM, for the tunnel Kobilja Glava 7.7 million BAM and from the exit of the tunnel to the village Hotonj 6.4 million BAM.

As for the cost of construction works from Kranjceviceva Street to Velesici, for a length of 0.76 kilometers will be required 23.4 million BAM. The section from Velesici to Bar is 1.42 kilometers long, and it will cost more than 24 million BAM. The section from Bar to tunnel Kobilja Glava is 1.28 kilometers long, and it will cost around 27.6 million BAM.

The most demanding section will be tunnel Kobilja Glava, in the length of 0.72 kilometers, which will cost more than 63 million BAM. The section from the exit of the tunnel Kobilja Glava to Hotonj is 0.90 kilometers long, and it will require 19.4 million BAM.

After the Government of CS analyzes cost estimations by the Ministry of Transport CS, it will be decided which of the five sub-sections will be constructed first. Some of the funds will be also required for the relocation of utility installations.

Government of CS will most likely analyze the report of the Construction Institute of CS at the next session.

Sarajevo First Transversal has a role to connect North longitudinal (at Railway station) with a future city highway (in Velesici) and finally with Vogosca, with a connection to the A1 highway.

Replacement facilities within the land expropriation should be built in Sip. It is important to emphasize that the funds for expropriation of land must not be provided by loan funds.

First transversal will be categorized as a main road, and its construction will greatly relieve urban traffic, which is why everyone eagerly awaits the beginning of construction works.

(Source: S. H./Klix.ba)

Lawsuits filed against the RS Government for illegal Mine

Successful Business Story by Textile Division of AS Group

Delegation Of One Of The World’s Largest Construction Companies Arrives In Sarajevo

“BiH imports 65 percent of Food, and Millions of Hectares remain uncultivated”

Public Enterprise Highways of FB&H Takes the Burdain of VAT: No Increase in Tolls Prices

TAGGED:#analysis#money#new#transfersal#velesici#Vogosca
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Athletic Meeting: Amel Tuka to perform for the first time
Next Article White Trail opened: Tourism is one of the fastest growing Branches
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Anes Bostandzic Reaches Premier League Final in China
April 11, 2026
Petrol Stations in BiH recorded a further Increase in Prices
April 11, 2026
Traditional Easter Egg Decorating Event held in Banja Luka
April 11, 2026
Balkan Divide Deepens: 2026 Unemployment Map Highlights Alarming Gap for BiH
April 11, 2026
Seriously wounded Mojtaba Khamenei leads Iran out of Isolation as Doubts grow about his Power
April 11, 2026
Slovenian Contingent Change of Command at Camp Butmir
April 11, 2026
Members of the Women of Srebrenica Association held a peaceful Protest in Tuzla
April 11, 2026
Easter Greetings from the Members of the Presidency
April 11, 2026
Strasbourg Court Rejects Dodik’s Bid to Suspend Verdict on RS Presidency
April 11, 2026
Instead of the European Union – BiH is getting closer to the Moneyval Grey List
April 11, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?