By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: HPP Una Kostel in Phase II of the Realization of 16.2 million EUR worth Project
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > HPP Una Kostel in Phase II of the Realization of 16.2 million EUR worth Project
BUSINESS

HPP Una Kostel in Phase II of the Realization of 16.2 million EUR worth Project

Published November 16, 2017
Share
SHARE

The hydropower plant Una Kostel near Bihac is working on the continuation of phase II of its reconstruction and expansion, which will enable the increase of installed power and further increase the production.

The decision on investment in this project was adopted back in 2014, and its value was estimated at 16.2 million EUR. The project-technical documentation is currently under preparation and the beginning of implementation is planned for the year of 2020.

The start of the exploitation is planned for 2023 when it is expected for the installed power to be increased by about 5 MW with an additional production of about 23 GWh.

“The project of reconstruction and expansion of HPP Una Kostel represents a project on the already existing plant, the reconstruction in riverbed of Una River and the extension through the construction of the so-called Aneks, with the aim of increasing the production efficiency of the plant, the optimal use of Una River and the extension of the working life of the plant. Considering that these works are performed on the already existing plant or in its immediate environment, they will not change the existing state of the environment and the flow of water,” said Samira Talic, expert coordinator for the preparation of the construction of the HPP of PE Elektroprivreda BiH.

HPP Una Kostela was put into operation back in 1954, and its optimum long-term operation was provided through programs of maintenance, revitalization, and reconstruction on several occasions.

Reconstruction of the plant in this HPP started back in 2000 within the first phase, and it included the replacement of the obsolete electrical equipment and certain parts of the plant were reconstructed as well. After the phase I of the reconstruction, the installed flow rate was increased to 88 m³/s, i.e. installed power at 10.14 MW 4 × 2.536 kW.

(Source: akta.ba)

Charter of Kulin Ban was written on this day in 1189

Take a Look at the Scenes from besieged Sarajevo while recording a Movie

Bosnian with Down Syndrome passed the Exam for Black Belt

Increase in Number of Persons infected with Coronavirus in Bosnia and Herzegovina

Edin Dzeko reveals who is the best Player with whom he played

TAGGED:#BiH#project#reconstructionHPP Una Kostela
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Ceremony on the ‘Day of ‘Veterans’: Charter for the First President of BiH Alija Izetbegovic
Next Article Pjanic’s Son Edin delighted Fans of Juventus with his goalkeeping Skills (VIDEO)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

SDP calls on judicial Authorities to prosecute Dodik, dangerous Hate Speech and Racism
February 7, 2026
Steel Exports from Bosnia and Herzegovina are in Decline
February 7, 2026
Gold and Bronze for BiH Judokas at the European Junior Cup in Sarajevo
February 7, 2026
Imamovic: American Experts know that Dodik is a Russian Player and US Hater
February 7, 2026
The Delegation of RS rates the multi-day Official Visit to the United States as successful
February 7, 2026
Election Silence in Effect in Entity of Republika Srpska
February 7, 2026
World Trade Center Sarajevo is entering a Key Phase of Development
February 7, 2026
Sarajevo Olympic Week officially opened
February 7, 2026
Trump threatens additional Tariffs on Countries that Trade with Iran
February 7, 2026
The American Senator is asking for Sanctions to be Reintroduced on Dodik
February 7, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?