By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: New Increase in Excise Taxes in Sight?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > New Increase in Excise Taxes in Sight?
BUSINESS

New Increase in Excise Taxes in Sight?

Published: April 26, 2016
Share
SHARE

13106528_1164120330305588_949166295_oPrime Minister of FBiH Fadil Novalić assessed that one of the causes of the halt in the construction of the highway is the fact that increase of excise taxes on fuel is not adopted on national level yet. This increase in excise taxes would ensure the potential of 900 million EUR for the construction of traffic infrastructure.

According to Novalić, new excise tax opens new possibilities for credit indebting, and thereby for acceleration of the construction of the Corridor 5C. In addition to economic growth, this would also have a favorable impact on the increase in the number of employed people and on the placement of domestic goods.

Novalić said that the current value of constructed highway sections amounts to 700 million EUR, highlighting that the mentioned excise tax opens possibility for construction of new kilometers worth 900 million EUR, as well as for the construction of a speed road through central Bosnia.

The implemented analyses show that the existing model with excise taxes will be drained by 2019.

“The remaining part of the highway costs one billion 250 million EUR and the existing model is not sufficient to cover that. We will have to look for some concession, Bot arrangements and other models of financing the construction of traffic infrastructure,” Novalić added.

Novalić reminded that the Constitutional Court withdrew the law on expropriation, corrected the deficiencies, and returned it to both houses of the Parliament.

“These problems are standing in our way of faster construction of the highway, although we are technically ready to build around Mostar and Zenica,” Novalić said, adding that he expects these problems to be solved.

Acceleration of construction of the highway on the Corridor 5C and the speed road through the Lašva valley was discussed yesterday at the meeting which the President of FBiH Marinko Čavara held with the Prime Minister of FBiH Fadil Novalić, Deputy Prime Minister and Minister of Finance of FBiH Jelka Milićević, Minister of Spatial Planning of FBiH Josip Martić, Minister of Transport and Communications of FBiH Denis Lasić, and the Director of Public Enterprise “Motorways of FBiH” Jasmin Bučo.

(Source: faktor.ba)

The Negotiations for Opening a Palestinian Bank in BiH are in Progress
The Helicopter procured by the cantonal MUP is the best that the state of BiH will have
Conference in Sarajevo on Friday ‘Economic Challenges and Chances in Southeast Europe’
Cvijanovic: Rebalance of the RS Budget in November
Chinese Company to build Thermal Power Plant Gacko II?
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article 110 million BAM worth Job for Euro-Asfalt in Slovenia
Next Article Preparations for the Tourist Season in Jajce starts
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Commemoration of the 34th Anniversary of the Suffering of Bosniaks in the Susica Camp
September 26, 2026
Dragons hold a Training Session in Warsaw ahead the Trip to Bucharest
September 26, 2026
Everything You Need to Know Before the Elections: CEC Publishes Detailed Lists and Instructions for Citizens
September 26, 2026
Bosnian Diaspora Files Complaints Against Swiss Magazine Weltwoche Reporting on War Criminal Mladic
September 26, 2026
UDIK remembers the Anniversary of the Closing of the Susica Camp near Vlasenica
September 26, 2026
Sarajevo Canton Ministry of Internal Affairs is acquiring new Special Armored Vehicles
September 26, 2026
FUZIP implements Measures from the FATF Action Plan to prevent Money Laundering
September 26, 2026
Linguistic Diversity Celebrated in Gorazde for European Day of Languages
September 26, 2026
Dispute over Licenses for Professional Drivers: Who issues valid Documents
September 26, 2026
Barbarez satisfied with BiH’s Performance after Draw with Poland
September 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?