By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH
BUSINESS

The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH

Published: June 17, 2022
Share
SHARE

Without the necessary permits, and with protests by activists, on the Bistrica River, not far from Foca in eastern Bosnia and Herzegovina (BiH), a Chinese contractor is making preparations for the construction of a hydroelectric power plant.

Currently, there are no environmental impact studies, and therefore no environmental permits are necessary to prevent a possible negative impact on the environment.

Jelena Ivanic from the non-governmental Center for the Environment, therefore, emphasizes that the project is undoubtedly controversial.

At the end of last year, the Chinese National Aerotechnological Corporation for International Engineering AVIC officially started the construction of hydroelectric power plants “Bistrica” ​​1, 2, and 3, in the presence of representatives of the Chinese Embassy in BiH and the Republika Srpska (RS) entity authorities.

Due to its dealings with the Chinese military, this company is on the list of those in which American citizens and companies are prohibited from investing.

The entire project is worth 102 million euros, and the total installed capacity of the three hydropower plants is 39 megawatts with a total annual production of 152 gigawatt–hours (GWh) of electricity.

According to the data of the State Agency for Statistics from 2020, BiH annually produces 16.874 GWh of electricity – of which 4.663 come from hydropower plants.

Although the cornerstone was laid on December 28th, part of the money for the construction was provided only on April 14th, when “Elektroprivreda” borrowed from “Unicredit Bank” from Banja Luka, from which it received 30 million BAM (15 million euros) in loans.

In the same month, the company “HE Bistrica” ​​announced a public procurement for the supervision of construction works, worth 1.5 million euros.

Dejan Pavlovic, acting director of HPP Bistrica, told Radio Free Europe (RFE) that building permits from 13 years ago – obtained for preparatory work – are still valid.

The Banja Luka Center for the Environment claims that the citizens stated at the last public debate in Foca in April, when the Draft Environmental Impact Study was reviewed, that they were against hydroelectric power plants.

Jelena Ivanic from the Center points out that with the current permits, only preparatory works are possible. That, she says, was confirmed to them by the on-site inspection.

Chinese investments in BiH

Chinese investors plan to invest 130m euros in the Ivovik wind farm, which is planned to be built in the Tomislavgrad and Livno, areas of southwest BiH.

Infrastructure investments are also planned. The Chinese company Shandong should build a 42-kilometer highway from Banja Luka to Prijedor, the price of which is 297 million euros.

BH Company Bimal explained the Fall of their Income and Profits
The Chinese are interested in construction of Thermal Power Plants in BiH
B&H Brands in Biggest Concept Shopping Center in the World
The Farm in BiH produces Electricity from Biomass
Railways of RS recorded Loss this Year as well
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article At the NATO Meeting on Ukraine, Podzic also spoke about security Challenges in the Balkans
Next Article Citizens of the Federation to get Vouchers of 200 BAM for Vacation
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BiH Footballer Kerim Alajbegovic says Goodbye to Austrian Red Bull Salzburg
May 16, 2026
Podgorica and Belgrade exchange messages after Vucic’s Statement on Montenegro’s Independence Day
May 16, 2026
Budimir: We have the most prepared Police Agency in BiH
May 16, 2026
Construction of the New Mostar Airport Terminal Worth 1.5 Million Begins
May 16, 2026
He Was a Yugoslav Sports Legend, Now Facing Hard Times: “I Collect Bottles, I Am Not Ashamed”
May 16, 2026
New Adrenalin Attraction Overlooking the Neretva: Via Ferrata “Prenjska Vrata” for the Brave and Adventurous
May 16, 2026
A Major Turnaround in Pretis: Instead of Huge Profit – a Multi-Million Loss
May 16, 2026
Motorway Sections in the Federation of Bosnia and Herzegovina to Open in 2026
May 16, 2026
Modest Economic Recovery: Can Bosnia and Herzegovina Sustain a Positive Trend?
May 16, 2026
“The CHALLENGE” Exhibition on Italian Sports Design Opens at the Olympic Museum Sarajevo
May 16, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?