By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH
BUSINESS

The Chinese Contractor lacks environmental Permits for hydroelectric Power Plants in BiH

Published June 17, 2022
Share
SHARE

Without the necessary permits, and with protests by activists, on the Bistrica River, not far from Foca in eastern Bosnia and Herzegovina (BiH), a Chinese contractor is making preparations for the construction of a hydroelectric power plant.

Currently, there are no environmental impact studies, and therefore no environmental permits are necessary to prevent a possible negative impact on the environment.

Jelena Ivanic from the non-governmental Center for the Environment, therefore, emphasizes that the project is undoubtedly controversial.

At the end of last year, the Chinese National Aerotechnological Corporation for International Engineering AVIC officially started the construction of hydroelectric power plants “Bistrica” ​​1, 2, and 3, in the presence of representatives of the Chinese Embassy in BiH and the Republika Srpska (RS) entity authorities.

Due to its dealings with the Chinese military, this company is on the list of those in which American citizens and companies are prohibited from investing.

The entire project is worth 102 million euros, and the total installed capacity of the three hydropower plants is 39 megawatts with a total annual production of 152 gigawatt–hours (GWh) of electricity.

According to the data of the State Agency for Statistics from 2020, BiH annually produces 16.874 GWh of electricity – of which 4.663 come from hydropower plants.

Although the cornerstone was laid on December 28th, part of the money for the construction was provided only on April 14th, when “Elektroprivreda” borrowed from “Unicredit Bank” from Banja Luka, from which it received 30 million BAM (15 million euros) in loans.

In the same month, the company “HE Bistrica” ​​announced a public procurement for the supervision of construction works, worth 1.5 million euros.

Dejan Pavlovic, acting director of HPP Bistrica, told Radio Free Europe (RFE) that building permits from 13 years ago – obtained for preparatory work – are still valid.

The Banja Luka Center for the Environment claims that the citizens stated at the last public debate in Foca in April, when the Draft Environmental Impact Study was reviewed, that they were against hydroelectric power plants.

Jelena Ivanic from the Center points out that with the current permits, only preparatory works are possible. That, she says, was confirmed to them by the on-site inspection.

Chinese investments in BiH

Chinese investors plan to invest 130m euros in the Ivovik wind farm, which is planned to be built in the Tomislavgrad and Livno, areas of southwest BiH.

Infrastructure investments are also planned. The Chinese company Shandong should build a 42-kilometer highway from Banja Luka to Prijedor, the price of which is 297 million euros.

The Need for BiH to transition to affordable and available renewable Energy is clear

EBRD Supports Water Infrastructure in Bosnia and Herzegovina

Official: Mercator returns on the Market of BiH

Agreement Signed in Sarajevo on Business Cooperation Between VTKBiH of BiH and Slovenia

BiH imports Labor Force, and Students are forbidden to work

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article At the NATO Meeting on Ukraine, Podzic also spoke about security Challenges in the Balkans
Next Article Citizens of the Federation to get Vouchers of 200 BAM for Vacation
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Increased Traffic Intensity, the heaviest Congestion at Border Crossings to the South
May 1, 2026
Nebojsa Vukanovic announces His Candidacy for the Member of BiH Presidency
May 1, 2026
EPBiH Reclaims Property Registered Under EP HZHB Ownership”
May 1, 2026
Interview with the Ambassador of BiH to the United Nations Zlatko Lagumdzija
April 30, 2026
HR Schmidt: BiH should take Advantage of changing Circumstances in Europe to advance its European Path
April 30, 2026
Sniper Alley Searches for a Photographer Who Captured a Boy During the Siege of Sarajevo
April 30, 2026
BiH Minister of Defense meets the Ambassador of the Kingdom of Spain to BiH
April 30, 2026
The Central Bank of BiH pays 184 Million BAM in Profit in BiH Budget
April 30, 2026
“The Court’s Decision to release Kunarac is a Slap in the Face to all Victims of War Crimes”
April 30, 2026
Discover the Forgotten Gates of Sarajevo: Secrets and the Influence of Austro-Hungarian Architecture
April 30, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?