By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Construction of new Sections between Sarajevo and Mostar is being prepared
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Construction of new Sections between Sarajevo and Mostar is being prepared
BUSINESS

The Construction of new Sections between Sarajevo and Mostar is being prepared

Published May 7, 2023
Share
SHARE

A meeting was held in the operational office of Public Utility Company (JP) Autoceste of the Federation of Bosnia and Herzegovina (FBiH) on the topic of the dynamics of creating project documentation for the construction of sections exiting the Prenj tunnel – Mostar north and Ovcari – entering the Prenj tunnel, as part of Corridor 5C.

On this occasion, conceptual projects that are in the final stage were presented. (The Prenj Tunnel with a length of over 10 kilometers is the most complex project on Corridor 5C).

The process of building the highway from the southern part of Mostar to the north is of key importance for the FBiH, i.e. the entire route of Corridor 5C, for several reasons, starting from economic to construction.

Both of these sections are located in the Herzegovina-Neretva Canton. The projects are of great importance for the development of local communities, which will enable faster, safer and more comfortable traffic.

Exit from the tunnel Prenj – Mostar north

The route starts after exiting the Prenj tunnel and continues in the direction of Mostar, where it ends with the Mostar north interchange. The total length of the section is 12.34 km. The height difference from the beginning to the end is about 439 m.

Ovcari – entrance to the Prenj tunnel

The route starts at the Ovcari interchange just before the town of Konjic and after crossing the M-17 highway, it continues through two tunnels towards the settlement of Bijela and further towards the Prenj mountain and tunnel. The total length of the section is 10.32 km.

This is one of the most difficult sections of the highway on Corridor 5C.

In addition to this, the preparation of documentation for the southern connection of the city of Konjic to the main road M-17 in a total length of L=3.54km with two bridges M1 L=380m and M2 L=70m and a tunnel with a length of L=820m is envisaged.

The development of project documentation is funded by a grant from the European Commission, and the company AIK d.o.o. Banovici was chosen as the designer, Biznis Info reports.

Story about the impressive Career of the 26-year-old Alen Žunić

Representatives of “Hugo Boss“ in “Napredak“ Company in Tesanj

Savings of Residents in Republika Srpska Entity hit Record

Law on Financial Operations: All Payments have to be made within 30 days

BH Food to be exported to the United Arab Emirates soon?

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Can BiH become a Carbon Neutral Country in the Next 27 Years?
Next Article A never-seen-before Video of the Demolition of the Old Bridge in Mostar
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Kovacevic to Filipovic: BiH is supported with an anti-fascist Flag with Lilies
April 26, 2026
SDA: Irresponsible Map Drawing in Zagreb Brought Suffering to All, Including BiH Croats
April 26, 2026
Mostar HPP Case: How Was It “Given” to the Croatian Defence Council after the War and Why Is There a Legal Battle for Its Parcel
April 26, 2026
Vucic on “Sarajevo Safari”: They Used AI to Add a Rifle to My Photo
April 26, 2026
Who is Cole Thomas Allen, the Suspect in the shooting at the White House Correspondents’ Dinner?
April 26, 2026
Dino Mustafic’s Film “Pavilion” wins Award in New York
April 26, 2026
Over Two Thousand Runners participate in Sarajevo Marathon
April 26, 2026
Bosnia and Herzegovina named the most popular Destination in Europe
April 26, 2026
Fierce Reaction of the IGK to the controversial ‘BiH division’ Map
April 26, 2026
White House Shooting: Secret Service Agent wounded, Donald and Melania Trump evacuated
April 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?