By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The largest Bridge on Corridor Vc is finally connected
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > WORLD NEWS > The largest Bridge on Corridor Vc is finally connected
WORLD NEWS

The largest Bridge on Corridor Vc is finally connected

Published: July 7, 2023
Share
SHARE

With the final connection of the span structure in fields 6 and 7, the Pocitelj bridge was finally connected. With a height of over 100 meters and a length of almost one kilometer, the Pocitelj Bridge is one of the highest bridges in the region, which makes it one of the most complex structures on the entire Corridor Vc.

“Today’s connection of the Pocitelj bridge can be freely marked as the beginning of a more active, dynamic period ahead of us, in which we aim to intensify the construction of the highway in Herzegovina. With the near completion of activities on the Pocitelj – Zvirovici section and the start of construction work on the Prenj tunnel and the Mostar north – Mostar south section and the Kvanj – Buna tunnel, which we plan to contract this year, we are opening new perspectives for the business community and raising the economic potential of this part of Bosnia and Herzegovina (BiH) to a higher level,” said Denis Lasic yesterday, acting director of the public company Motorways of the Federation of BiH (FBiH).

The Pocitelj bridge is designed as a continuous prestressed girder bridge with a main span of 147 m, a variable box cross-section, and a unique construction for both carriageways and columns monolithically connected to the span construction, which is carried out by free cantilever construction.

The total amount of material installed in the bridge is 38.000 cubic meters of concrete, 9.000 tons of reinforcement, and 1.500 tons of prestressing cables, while 20.000 square meters of asphalt and waterproofing will be installed in the coming period.

The construction of the Pocitelj bridge, a bridge that bridges the M-17 main road, the Neretva River, and the Sarajevo-Ploce railway, is being financed from the funds secured under the loan agreement concluded with the European Investment Bank (EIB) and grants from the European Union (EU) provided under the Agenda for Connection through the Investment Framework for the Western Balkans (WBIF), and the total value of the works for the construction of the Pocitelj bridge is 28.114.889.53 euros without VAT.

Completion of the construction of the Pocitelj Bridge is expected in the fall of this year.

Samsung CEO Han Jong-hee dies at the Age of 63
Viktor Orban: We don’t want a “mini Gaza” in Budapest
BiH Foreign Minister to meet with his Danish Counterpart
Sarajevo Hosts Expert Workshop on Crisis Management, Marking a New Chapter in Slovakia–BiH Cooperation
Zelensky names possible Venues for a direct Meeting with Putin
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sad Testimony of the People of Srebrenica: He carried his Brother for 27 kilometers
Next Article SDA asks the IC to stop Milorad Dodik’s Secessionist Forces
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Red Bull Cliff Diving: An Exciting Battle for Title Continues This Week with Old Bridge Dive
July 29, 2026
House of Peoples of the PA of BiH Supported an Urgent Procedure for the 2026 Budget
July 28, 2026
Acting High Representative visits Central Election Commission
July 28, 2026
“We call on Believers to respond to this with Prayer, Fasting, and Forgiveness”
July 28, 2026
General of the Army of the Republic of Bosnia and Herzegovina Ramiz Drekovic passes away
July 28, 2026
Zenica GSS travel to the Russian Federation for the surviving Mountaineers
July 28, 2026
Kojovic: European Money is ready, but Dodik’s Blockades left BiH without Hundreds of Millions of Euros
July 28, 2026
Foreign Shoppers Spent 40.5 Million BAM in BiH in First Half of 2026
July 28, 2026
State Budget for 2026 adopted with a Seven-month Delay
July 28, 2026
Bodies of All Five Bosnian Mountaineers Killed on Elbrus Recovered
July 28, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?