By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: When to expect the Completion of Cycling Trails in Sarajevo?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > When to expect the Completion of Cycling Trails in Sarajevo?
OTHER NEWS

When to expect the Completion of Cycling Trails in Sarajevo?

Published June 18, 2015
Share
SHARE

Cycling Trail Sarajevo radiosarajevo.baThe Municipality Novi Grad will be the first municipality in B&H which will, at the end of June, have a cycling trail built by European standards.

With its construction, in the length of over four kilometers, a one-way bicycle traffic on both sides of the main road will be established, in the direction of conducting of the motor traffic. The construction is funded by the City of Sarajevo and the Roads Directorate of the Sarajevo Canton.

At the section from the former retirement home to the pedestrian bridge at Vistafon, te workers of the Cantonal Public Utility Company (KJKP) ”Rad” have completed the construction works, the construction of the trail, made a partial coloring of he substrate, the labeling of the horizontal signalization is in progress, which is soon to be followed by the installation of vertical traffic signalization, it was announced from the Press Service of the City of Sarajevo.

The Municipality Novi Grad in cooperation with the Roads Directorate of the Sarajevo Canton has along with the newly built cycling trail restored the damaged section of the walking trail, which was in very poor condition, and as stated, the municipality is planning to set new benches along the walking trail and plant a hedge along the cycling trail, as well as to build a resting area at the Olympic pool Otoka, where the wireless Internet (Wi-Fi) services will be provided.

“The workers of ”Rad” will soon terminate the land works on future cycling path from the pedestrian bridge at Vistafon towards Otoka, along which a new footpath is to be built”, the statement said.

In parallel, the Municipality Novi Grad also conducted interviews with the design engineers and arranged the concept of a future cycling trail from Nedžarići to Dobrinja. After that, the drafting will begin of the preliminary and detailed design of the construction of the cycling trail on this stretch, and its connection to the “city” bicycle path in Nedžarići.

The main project envisages that the second stage goes from the bridge on Otoka along the main road to the beginning and through Wilson’s promenade, in the area of the Municipality Novo Sarajevo.

(Source: klix.ba/ photo radiosarajevo)

BiH to be admitted to the WTO much sooner than expected?

Friends want me to help them because the Police stopped them for Speeding, Driving through the Red Light…

Watch OZNNA tonight at 20:30 o’clock on Occasion of the National Day of B&H

How many People asked for Asylum in BiH this Year?

30th Anniversary of the Suffering of Bosniak Civilians marked

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Top 10 Things to do in Mostar (gallery) part 2
Next Article Support Domestic: First 25 Tons of Dita Products Ready for Sale
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Trump announces End to War with Iran: ‘We have an incredible Two days ahead’
April 15, 2026
A new Law on the Southern Gas Interconnection has been adopted in the Federation of BiH
April 15, 2026
Interfaith Delegation from the Midlands prepares for a Visit to BiH
April 15, 2026
Cooperation between BiH and NATO in Focus of Meeting in Brcko
April 15, 2026
Bosnian Photographer Finds Items and Bones Believed to Belong to National Hero Ilija Spanovic
April 15, 2026
A Spectacle Expected at Kosevo Stadium: 30,000 Fans Set to Attend BiH vs North Macedonia Match
April 15, 2026
War Criminal Ratko Mladic Suffers Stroke While Serving Life Sentence
April 15, 2026
HR Schmidt says European Integration must urgently move beyond the Deadlock
April 15, 2026
EUFOR Forces Step Forward: Blood Donation Drive Supports Local Communities
April 15, 2026
Red Bull 400 Race Applications Open: Are You Ready for the Toughest 400 Meters of Your Life?
April 15, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?